Paper | Title | Page |
---|---|---|
MO6PFP069 | Progress on the MuCOOL and MICE Coupling Coils | 289 |
|
||
Funding: This work is supported by funds under the “985-2” plan of HIT. This work is also supported by the Office of Science, US-DOE under DOE contract DE-AC02-05CH11231 and by NSF through NSF-MRI-0722656. The superconducting coupling solenoid for MuCOOL and MICE will have an inside radius of 750 mm, and a coil length of 285 mm. The MuCOOL coupling coil is identical to the MICE coupling coils. The MICE coupling magnet will have a self inductance of 592 H. When operated at it maximum design current of 210 A (the highest momentum operation of MICE), the magnet stored energy will be about 13 MJ. These magnets will be kept cold using a pair of pulse tube cryocoolers that deliver 1.5 W at 4.2 K and 55 W at 60 K. This report describes the progress on the MuCOOL and MICE coupling magnet design and engineering. The progress on the construction of the first coupling coil will also be presented. |
||
MO6PFP070 | Progress on the Fabrication and Testing of the MICE Spectrometer Solenoids | 292 |
|
||
Funding: This work is supported by the Office of Science, United States Department of Energy under DOE contract DE-AC02-05CH11231. The Muon Ionization Cooling Experiment (MICE) is an international collaboration that will demonstrate ionization cooling in a section of a realistic cooling channel using a muon beam at Rutherford Appleton Laboratory (RAL) in the UK. At each end of the cooling channel a spectrometer solenoid magnet consisting of five superconducting coils will provide a 4 tesla uniform field region. The scintillating fiber tracker within the magnet bore tubes will measure the emittance of the muon beam as it enters and exits the cooling channel. The 400 mm diameter warm bore, 3 meter long magnets incorporate a cold mass consisting of two coil sections wound on a single aluminum mandrel: a three-coil spectrometer magnet and a two-coil section that matches the solenoid uniform field into the MICE cooling channel. The fabrication of the spectrometer solenoids has been completed, and preliminary testing and field mapping of the magnets is nearly complete. The key design features of the spectrometer solenoid magnets are presented along with a summary of the progress on the testing and magnetic measurements. |
||
WE5PFP005 | The Normal Conducting RF Cavity for the MICE Experiment | 1994 |
|
||
The international muon ionization cooling experiment (MICE) requires low frequency and normal conducting RF cavities to compensate for muon beams’ longitudinal energy lost in the MICE cooling channel. Eight 201-MHz normal conducting RF cavities with conventional beam irises terminate by large and thin beryllium windows are needed. The cavity design is based on a successful prototype cavity for the US MUCOOL program. The MICE RF cavity will be operated at 8-MV/m in a few Tesla magnetic fields with 1-ms pulse length and 1-Hz repetition rate. The cavity design, fabrication, post process plans and as well as integration to the MICE cooling channel will be discussed and presented in details. |