A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Vascotto, A.

Paper Title Page
TH6REP098 Preinjector Gun Upgrade, Timing and Synchronization and Preparation for the Top-Up Injection in Elettra 4183
 
  • A. Carniel, S. Bassanese, M. Ferianis, E. Karantzoulis, C. Scafuri, A. Vascotto
    ELETTRA, Basovizza
 
 

Elettra is the third generation light source in operation in Trieste since 1993,upgraded with a full energy booster injector last year. Top-up operation is on schedule in the near future but already the new timing system and gun are ready to operate in this mode. The paper describes all tasks and requirements needed to satisfy top-up injection include custom made hardware, interaction with controls and radiation protection system.