Paper | Title | Page |
---|---|---|
TU6RFP032 | Improvements to Antiproton Accumulator to Recycler Transfers at the Fermilab Tevatron Collider | 1608 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. Since 2005, the Recycler has become the sole storage ring for antiprotons used in the Tevatron Collider. The operational role of the Antiproton Source has shifted exclusively towards producing antiprotons for periodic transfers to the Recycler. The process of transferring the antiprotons from the Accumulator to the Recycler has been greatly improved, leading to a dramatic reduction in the transfer time. The reduction in time has been accomplished with a net improvement in transfer efficiency and an increase in average stacking rate. This paper will describe the software improvements that streamlined the transfer process and other changes that contributed to a significant increase in the number of antiprotons available to the Collider. |
||
FR5REP030 | Operating Procedure Changes to Improve Antiproton Production at the Fermilab Tevatron Collider | 4832 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy Since the start of Fermilab Collider Run II in 2001, the maximum weekly antiproton accumulation rate has increased from 400·1010 Pbars/week to approximately 3,700·1010 Pbars/week. There are many factors contributing to this increase, one of which involves changes to operational procedures that have streamlined and automated antiproton source production. Automation has been added to our beam line orbit control, stochastic cooling power level management, and RF settings. In addition, daily tuning efforts have been streamlined by implementing sequencer driven aggregates. |