A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Urbant, M.

Paper Title Page
TU6PFP042 Dual-Energy Electron Linac for Cargo Inspection System 1378
 
  • M.A. Ferderer, D. Churanov, A.A. Krasnov, M. Urbant, A.A. Zavadtsev, D.A. Zavadtsev
    IBS, Atlanta, Georgia
  • S.V. Kutsaev, N.P. Sobenin
    MEPhI, Moscow
 
 

In today’s turbulent and unsecure world, an X-ray radiographic image and a dual-energy Z-detection mapping of a container contents are needed to provide a reasonable level of port and border security. An interlaced dual-energy electron-beam linac has been developed for the use in cargo inspection systems to meet this growing need. Electron energy of the linac is software controllable from 3 to 15 MeV. Nominal operating energy levels of 4 and 9 MeV were chosen. The 9 MeV beam energy operating point is used for generating the X-ray radiographic image while 4 and 9 MeV beams are used for Z-detection mapping. The S-band linac has been calculated, designed, built and tested. Frequency repetition rate of alternating 4 and 9 MeV beams is 240 Hz. Pulse length is 10 μs. The beam energy in each beam pulse is over 10 J.