A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Underwood, D.G.

Paper Title Page
FR1GRC04 AGS Polarized Proton Operation in Run 2009 4251
 
  • H. Huang, L. A. Ahrens, M. Bai, K.A. Brown, C.J. Gardner, J.W. Glenn, F. Lin, A.U. Luccio, W.W. MacKay, T. Roser, V. Schoefer, S. Tepikian, N. Tsoupas, K. Yip, A. Zelenski, K. Zeno
    BNL, Upton, Long Island, New York
  • H.M. Spinka, D.G. Underwood
    ANL, Argonne
 
 

Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.


After installation of two partial snakes in the Brookhaven Alternating Gradient Synchrotron (AGS), a polarized proton beam with 1.5*1011 intensity and 65% polarization has been achieved. There are residual polarization losses due to horizontal resonances over the whole energy ramp and some polarization loss due to vertical intrinsic resonances. Many efforts have been put in to reduce the emittances coming into the AGS and to consequently reduce polarization loss. This paper presents the accelerator setup and preliminary results from run-9 operations.

 

slides icon

Slides