A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Trinczek, M.

Paper Title Page
FR5REP124 Beam Delivery and Future Initiatives at the ISAC Radioactive Ion Beam Facility 5074
 
  • M. Trinczek, F. Ames, R.A. Baartman, P.G. Bricault, M. Dombsky, K. Jayamanna, J. Lassen, R.E. Laxdal, M. Marchetto, L. Merminga, A.C. Morton, V.A. Verzilov, F. Yan
    TRIUMF, Vancouver
 
 

The ISAC facility, located at TRIUMF, first began delivering radioactive ion beams (RIBs) in 1998, added post-accelerated beam capability in 2001, and is regarded as one of the premiere RIB facilities in the world. The existing constraints on RIBs of Z<83 and accelerated beams of A/q<30 with energies limited to 5MeV/u are being addressed. A charge-state booster for RIBs has been commissioned to alleviate the A/q<30 restriction and has successfully delivered multi-charge beams through the ISAC accelerators. The 5MeV/u license limit will be removed once an on-line beam monitor is commissioned, allowing beams of up to 11MeV/u to be delivered presently, and increased to over 20MeV/u when the next accelerator phase is installed. In 2008, an actinide target was used to produce RIBs of Z>82; this successful test was performed on a uranium target with yields measured and radiation safety monitored. A new Beam Delivery group has been formed to integrate all aspects of RIB production, which has led to improved efficiency and greater experimental results. These new capabilities will be presented, showing how 2009 promises to be both an exciting and productive year at ISAC.