Paper | Title | Page |
---|---|---|
TU6RFP053 | Controlled Emittance Blow Up in the Tevatron | 1668 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. We have designed and commissioned a system which blows up the transverse emittance of the anti-proton beam without affecting the proton beam. It consists of a bandwidth limited noise source centered around the betatron tune, a power amplifier and a directional stripline kicker. The amount of blow up is controlled by the amount of energy delivered to the anti-protons betatron bands. |
||
TH5RFP041 | An Improved Retarding Field Analyzer for Electron Cloud Studies | 3540 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. We have designed a retarding field analyzer (RFA) and a rad-hard amplifier which improves the sensitivity over the present RFA installed in the Main Injector. From computer simulations and bench measurements, our RFA will have a 20% improvement in sensitivity compared to the Argonne National Laboratory (ANL) design. And when we couple our RFA to the matched rad-hard amplifier, S/N is also improved. |
||
FR1PBC04 | Recent Tevatron Operational Experience | 4230 |
|
||
Funding: Work supported by the United States Department of Energy under Contract No. DE-AC02-07CH11359 Over the past year Tevatron has been routinely operating at initial luminosity over 3·1032. The high luminosity regime highlighted several issues that became the focus for operational improvements. In this report we summarize the experience in such areas as mitigation of particle losses, maintaining orbit and optics stability, and identification of aperture restrictions. |
||
|
||
FR5RFP093 | BTF Simulations for Tevatron and RHIC with Resistive Wall Wake Field | 4755 |
|
||
Funding: This work was supported by the US DOE Office of Science, Office of Nuclear Physics, under Grant No.DE-FG02-08ER85183 Recent improvements to BBSIM permit detailed simulations of collective effects due to resistive wall wake fields. We compare results of beam transfer measurements (BTF) in the Tevatron and RHIC with and without the effects of resistive wall wake fields. These are then compared to actual BTF measurements made in both machines and the impact of intensity on our measurements. We also investigate the impact of resistive wall wake fields on various chromaticity measurement approaches. |
||
FR5REP056 | A Possible FNAL 750 keV Linac Injector Upgrade | 4896 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. The present FNAL Linac H- injector has been operational since 1978 and consists of a magnetron H- source and a 750-keV Cockcroft-Walton Accelerator. The proposed upgrade to this injector is to replace the present magnetron source having a rectangular aperture with a circular aperture, and to replace the Cockcroft-Walton with a 200-MHz RFQ. Operational experience at other laboratories has shown that the upgraded source and RFQ will be more reliable and require less manpower than the present system. |
||
FR1RAI02 | The Conversion and Operation of the Cornell Electron Storage Ring as a Test Accelerator (CesrTA) for Damping Rings Research and Development | 4200 |
|
||
Funding: Support provided by the US National Science Foundation, the US Department of Energy, and the Japan/US Cooperation Program. In March of 2008, the Cornell Electron Storage Ring (CESR) concluded twenty eight years of colliding beam operations for the CLEO high energy physics experiment. We have reconfigured CESR as an ultra low emittance damping ring for use as a test accelerator (CesrTA) for International Linear Collider (ILC) damping ring R&D. The primary goals of the CesrTA program are to achieve a beam emittance approaching that of the ILC Damping Rings with a positron beam, to investigate the interaction of the electron cloud with both low emittance positron and electron beams, to explore methods to suppress the electron cloud, and to develop suitable advanced instrumentation required for these experimental studies (in particular a fast x-ray beam size monitor capable of single pass measurements of individual bunches). We report on progress with the CESR conversion activities, the status and schedule for the experimental program, and the first experimental results that have been obtained. |
||
|