TU6RFP022 | First Results for the Beam Commissioning of the CERN Multi-Turn Extraction | 1578 |
|
||
The Multi-Turn Extraction, a new type of extraction based on beam trapping inside stable islands in the horizontal phase space, has been commissioned during the 2008 run of the CERN Proton Synchrotron. Both single- and multi-bunch beams with a total intensity up to 1.4×1013 protons have been extracted with efficiencies up to 98%. Furthermore, injection tests in the CERN Super Proton Synchrotron were performed, with the beam then accelerated and extracted to produce neutrinos for the CERN Neutrino to Gran Sasso experiments. The results of the extensive measurement campaign are presented and discussed in details. |
||
TU6RFP023 | Installation and Hardware Commissioning of the Multi-Turn Extraction at the CERN Proton Synchrotron | 1581 |
|
||
The implementation of new Multi-turn extraction at the CERN Proton Synchrotron required major hardware changes for the nearly 50-year old accelerator. The installation of new PFNs and refurbished kicker magnets for the extraction, new sextupole and octupole magnets, new power converters, together with an in-depth review of the machine aperture leading to the design of new vacuum chambers was required. As a result, a heavy programme of interventions had to be scheduled during the winter shut-down 2007-8. The newly installed hardware and its commissioning is presented and discussed in details. |