A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Scarvie, T.

Paper Title Page
MO6PFP087 Troubleshooting Status for the ALS In-Vacuum Insertion Device 333
 
  • A. Madur, S. Marks, S. Prestemon, D. Robin, T. Scarvie, D. Schlueter, C. Steier
    LBNL, Berkeley, California
 
 

Funding: This work is supported by the Director, Office of Science, U. S. Department of Energy under Contract No. DE-AC02-05CH11231.


In 2006, the 30mm period In-Vacuum Insertion Device (IVID) was operational for the femtosecond phenomena beamline at the Advanced Light Source (ALS) of Lawrence Berkeley National Laboratory. Since then the IVID has been demonstrating unexpected behaviors especially at small gaps (minimum gap = 5.5mm). The main observations related to these issues are partial or total beam losses as well as sudden pressure increases while operating the IVID gap. This paper is reporting these observations and describes the investigations and the repair attempt performed on this insertion device.

 
TU5RFP042 Commissioning and User Operation of the ALS in Top-Off Mode 1183
 
  • C. Steier, B.J. Bailey, K.M. Baptiste, W. Barry, A. Biocca, W.E. Byrne, P.W. Casey, M.J. Chin, R.J. Donahue, R.M. Duarte, M.P. Fahmie, J. Gath, S.R. Jacobson, J. Julian, J.-Y. Jung, A.M. Kritscher, S. Kwiatkowski, S. Marks, J.P. McKean, R.S. Müller, H. Nishimura, J.W. ONeill, G.J. Portmann, S. Prestemon, D. Robin, S.L. Rossi, F. Sannibale, T. Scarvie, D. Schlueter, B. Shuman, A.Z. Smith-Baumann, G.D. Stover, CA. Timossi, W. Wan, T. Warwick, J.M. Weber, R.P. Wells, E.C. Williams
    LBNL, Berkeley, California
 
 

Funding: This work was supported by the Director, Office of Science, U. S. Department of Energy under Contract No. DE-AC02-05CH11231.


The upgrade of the Advanced Light Source to enable top-off operation has been ongoing for the last four years. Activities over the last year have centered around radiation safety aspects, culminating in a systematic proof that top-off operation is equally safe as decaying beam operation, followed by commissioning and full user operations. Top-off operation at the ALS provides a very large increase in time-averaged brightness to ALS users (by about a factor of 10) as well as improvements in beam stability. The presentation will provide an overview of the radiation safety rationale, commissioning results, as well as experience in user operations.