A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Sattarov, A.

Paper Title Page
WE6PFP041 Petavac: 100 TeV Proton-Antiproton Collider in SSC Tunnel 2585
 
  • P.M. McIntyre, A. Sattarov
    Texas A&M University, College Station, Texas
 
 

Funding: DOE grant DE-FG02-06ER41405.


A conceptual design is presented for a 100 TeV proton-antiproton collider consisting of a single storage ring based upon 16.5 T dipoles, installed in the 83 km circumference SSC tunnel, fed using a proportionately expanded antiproton source. Provisions have been designed to intercept synchrotron light on room-temperature photon stops and to suppress electron cloud effect using a continuous clearing electrode running throughout the collider. Beams would be separated using split dipoles so that 20 ns bunch spacing should be attainable. Synchrotron damping time of half-hour would help to stabilize against mechanisms for slow emittance growth. It is reasonable to project the potential for a luminosity of 1035/cm2/s.