Rumolo, G.

Paper Title Page
MO6RFP008 Experimental Studies of Carbon Coatings as Possible Means of Suppressing Beam Induced Electron Multipacting in the CERN SPS 366
 
  • E.N. Shaposhnikova, G. Arduini, J. Axensalva, E. Benedetto, S. Calatroni, P. Chiggiato, K. Cornelis, P. Costa Pinto, B. Henrist, J.M. Jimenez, E. Mahner, G. Rumolo, M. Taborelli, C. Yin Vallgren
    CERN, Geneva
 
 

Electron cloud build-up is a major limitation for the operation of the SPS with LHC beam above nominal intensity. These beams are envisaged in the frame of the LHC luminosity upgrade and will be available from the new injectors LPSPL and PS2. A series of studies have been conducted in order to identify possible means to suppress electron multipacting by coating the existing SPS vacuum chambers with thin films of amorphous carbon. After a description of the experimental apparatus installed in the SPS, the results of the tests performed with beam in 2008 will be presented.

 
TU6PFP086 LHC Beams from the CERN PS Booster 1494
 
  • B. Mikulec, A. Blas, C. Carli, A. Findlay, K. Hanke, G. Rumolo, J. Tan
    CERN, Geneva
 
 

The CERN PS Booster (PSB) produces a variety of beam flavours for the LHC. While the nominal LHC physics beams require 6 Booster bunches with intensities up to 1.6·1012 protons per bunch, during the LHC commissioning single bunch beams with variable intensities as low as 5·109 protons have to be provided reproducibly. The final transverse and in many cases also the final longitudinal beam characteristics have to be achieved already in the PSB and can be very demanding in terms of beam brightness and stability. The optimized production schemes for the different LHC beam flavours in the PSB and the achieved machine performance are presented. Experience with the first beams sent to the LHC in September 2008 is discussed. An overview of the first measured results with a new production scheme of the nominal LHC beam using single instead of double-batch beam transfer from the PSB to the PS is also given.

 
TU6PFP087 High Intensity Beams from the CERN PS Booster 1497
 
  • B. Mikulec, M. Chanel, A. Findlay, K. Hanke, D. Quatraro, G. Rumolo, J. Tan, R. Tomás
    CERN, Geneva
 
 

The CERN Proton Synchrotron Booster (PSB) has been running for more than 30 years. Originally designed to accelerate particles from 50 to 800 MeV, later upgraded to an energy of 1 GeV and finally 1.4 GeV, it is steadily being pushed to its operational limits. One challenge is the permanent demand for intensity increase, in particular for CNGS and ISOLDE, but also in view of LINAC4. As it is an accelerator working with very high space charge during the low energy part of its cycle, its operational conditions have to be precisely tuned. Amongst other things resonances must be avoided, stop band crossings optimized and the machine impedance minimized. Recently, an operational intensity record was achieved with >4.25·1013 protons accelerated. An orbit correction campaign performed during the 2007/2008 shutdown was a major contributing factor to achieving this intensity. As the PSB presently has very few orbit correctors available, the orbit correction has to be achieved by displacing and/or tilting some of the defocusing quadrupoles common to all 4 PSB rings. The contributing factors used to optimize performance will be reviewed.

 
WE6PFP023 Status of the CLIC Beam Delivery System 2537
 
  • R. Tomás, B. Dalena, J. Resta-López, G. Rumolo, D. Schulte
    CERN, Geneva
  • D. Angal-Kalinin, F. Jackson
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • B. Bolzon, L. Brunetti, N. Geffroy, A. Jeremie
    IN2P3-LAPP, Annecy-le-Vieux
  • K.P. Schuler
    DESY, Hamburg
  • A. Seryi
    SLAC, Menlo Park, California
 
 

The CLIC BDS is experiencing the careful revision from a large number of world wide experts. This was particularly enhanced by the successful CLIC'08 workshop held at CERN. Numerous new ideas, improvements and critical points are arising, establishing the path towards the Conceptual Design Report by 2010.

 
WE6PFP085 Halo and Tail Simulations with Application to the CLIC Drive Beam 2700
 
  • M. Fitterer, A.-S. Müller
    KIT, Karlsruhe
  • E. Adli, H. Burkhardt, B. Dalena, G. Rumolo, D. Schulte
    CERN, Geneva
  • I. Ahmed
    NCP, Islamabad
  • A. Latina
    Fermilab, Batavia
 
 

We report about generic halo and tail simulations and estimates. Previous studies were mainly focused on very high energies as relevant for the beam delivery systems of linear colliders. We have now studied, applied and extended these simulations to lower energies as relevant for the CLIC drive beam.

 
TH5PFP012 Non Relativistic Broad Band Wake Fields and Potential-Well Distortion 3211
 
  • D. Quatraro, A. Findlay, B. Mikulec, G. Rumolo
    CERN, Geneva
 
 

The usual approach and treatment for the interaction of a particle beam with wake fields start from the assumption of ultrarelativistic beams. This is not the case, for example, for the Proton Synchrotron Booster (PSB) whose particles have a kinetic energy up to 1.4 GeV, with a relativistic gamma close to 2.5. There are some examples in literature which derive non ultrarelativistic formulas for the resistive wall impedance. In this paper we have extended the Broad-Band resonator model, allowing the impedance to have poles even in the half upper complex plane, in order to obtain a wake function different from zero for z greater than zero. The Haissinski equation has been numerically solved showing longitudinal bunch shape changes with the energy. In addition some longitudinal bunch profile measurements, taken for different energies and bunch intensities at the PSB, are shown.

 
TH5PFP013 Coherent Tune Shift and Instabilities Measurements at the CERN Proton Synchrotron Booster 3214
 
  • D. Quatraro, A. Blas, M. Chanel, A. Findlay, B. Mikulec, G. Rumolo
    CERN, Geneva
 
 

To understand one contribution to the intensity limitations of the CERN Proton Synchrotron Booster (PSB) in view of its operation with beams from Linac 4, the impedance of the machine has been characterized. Measurements of tune shift as a function of the intensity have been carried out in order to estimate the low frequency imaginary part of the impedance. Since the PSB is a low energy machine, these measurements have been done at two different energies,so as to enable us to disentangle the effect of the indirect space charge and resistive wall from the contribution of the machine impedance. An estimation of the possible resonant peaks in the impedance spectrum has been made by measuring a fast instability in Ring 4.

 
TH5PFP014 Non Relativistic Resistive Wall Wake Fields and Single Bunch Stability 3217
 
  • D. Quatraro, G. Rumolo
    CERN, Geneva
 
 

The usual approach for the resistive pipe wall assumes the beam moves with the speed of light. For many low energy rings, such as the Proton Synchrotron Booster (PBS), possible performance limitations may arise from non relativistic resistive wall wake fields. In this regime not only the head of the bunch can interact with the tail but also the vice versa holds. In this paper we analyze numerical results showing the resistive wake field calculated from non relativistic impedance models. In addition we analyze the well known two particles model assuming that even the trailing particle can affect the leading one. We observe significant changes in the stability domain.

 
TH5PFP015 Recent Developments for the HEADTAIL Code: Updating and Benchmarks 3220
 
  • D. Quatraro, G. Rumolo, B. Salvant
    CERN, Geneva
 
 

The HEADTAIL code models the evolution of a single bunch interacting with a localized impedance source or an electron cloud, optionally including space charge. The newest version of HEADTAIL relies on a more detailed optical model of the machine taken from MAD-X and is more flexible in handling and distributing the interaction and observation points along the simulated machine. In addition, the option of the interaction with the wake field of specific accelerator components has been added, such that the user can choose to load dipolar and quadrupolar components of the wake from the impedance database Z-BASE. The case of a single LHC-type bunch interacting with the realistic distribution of the kicker wake fields inside the SPS has been successfully compared with a single integrated beta-weighted kick per turn. The current version of the code also contains a new module for the longitudinal dynamics to calculate the evolution of a bunch inside an accelerating bucket.

 
TH5PFP052 Electron Cloud Simulations for ANKA 3321
 
  • U. Iriso
    CELLS-ALBA Synchrotron, Cerdanyola del Vallès
  • S. Casalbuoni
    FZK, Karlsruhe
  • G. Rumolo, F. Zimmermann
    CERN, Geneva
 
 

One of the key issues for the developments of superconducting insertion devices is the understanding of the beam heat load in the vacuum chamber. The beam heat load observed in the superconducting cold bore undulator installed in the ANKA storage ring is higher than the one predicted by the synchrotron radiation and resistive wall heating. A non linear increase of the dynamic pressure with the beam current is also observed in the cold bore. In order to investigate whether the nature of these effects is due to an electron cloud formation, we have performed several simulations using the ECLOUD code.

 
TH6REP078 Feedback Techniques and SPS Ecloud Instabilities – Design Estimates 4135
 
  • J.D. Fox, T. Mastorides, G. Ndabashimiye, C.H. Rivetta, D. Van Winkle
    SLAC, Menlo Park, California
  • J.M. Byrd, J.-L. Vay
    LBNL, Berkeley, California
  • R. De Maria
    BNL, Upton, Long Island, New York
  • W. Höfle, G. Rumolo
    CERN, Geneva
 
 

Funding: Work supported by Department of Energy contract DE–AC03–76SF00515 and the US LARP program.


The SPS at high intensities exhibits transverse single-bunch instabilities with signatures consistent with an Ecloud driven instability. While the SPS has a coupled-bunch transverse feedback system, control of Ecloud-driven motion requires a much wider control bandwidth capable of sensing and controlling motion within each bunched beam. This paper draws beam dynamics data from the measurements and simulations of this SPS instability, and develops initial performance requirements for a feedback system with 2-4 GS/sec sampling rates to damp Ecloud-driven transverse motion in the SPS at intensities desired for high-current LHC operation. Requirements for pickups, kickers and signal processing architectures are presented. Initial lab measurements of proof-of-principle lab model prototypes are presented for the wideband kicker driver signal functions.

 
FR2RAC02 Measurement and Analysis of SPS Kicker Magnet Heating and Outgassing with Different Bunch Spacing 4264
 
  • M.J. Barnes, F. Caspers, K. Cornelis, L. Ducimetière, E. Mahner, G. Papotti, G. Rumolo, V. Senaj, E.N. Shaposhnikova
    CERN, Geneva
 
 

Fast kicker magnets are used to inject beam into and eject beam out of the CERN SPS accelerator ring. These kickers are generally ferrite loaded transmission line type magnets with a rectangular shaped aperture through which the beam passes. Unless special precautions are taken the impedance of the ferrite yoke can provoke significant beam induced heating, over several hours, even above the Curie temperature of the ferrite. At present the nominal bunch spacing in the SPS is 25 ns, however for an early stage of LHC operation it is preferable to have 50 ns bunch spacing. Machine Development (MD) studies have been carried out with an inter-bunch spacing of 25 ns, 50 ns or 75 ns. For some of the SPS kicker magnets the 75 ns bunch spacing resulted in considerable beam induced heating. In addition the MDs showed that 50 ns bunch spacing could result in a very rapid pressure rise in the kicker magnet and thus cause an interlock. This paper discusses the MD observations of the SPS kickers and analyses the available data to provide explanations for the phenomena: possible remedies are also discussed.

 

slides icon

Slides

 
FR5RFP034 Transverse Impedance Localization Using Dependent Optics 4604
 
  • R. Calaga
    BNL, Upton, Long Island, New York
  • G. Arduini, E. Métral, G. Papotti, D. Quatraro, G. Rumolo, B. Salvant, R. Tomás
    CERN, Geneva
 
 

Funding: This work has been partially performed under the auspices of US department of energy


Measurements of transverse impedance in the SPS to track the evolution over the last few years show discrepancies compared to the analytical estimates of the major contributors. Recent measurements to localize the major sources of the transverse impedance using intensity dependent optics are presented. Some simulations using HEADTAIL to understand the limitations of the reconstruction and related numerical aspects are also discussed.

 
FR5RFP047 Analysis of the Transverse SPS Beam Coupling Impedance with Short and Long Bunches 4640
 
  • B. Salvant
    EPFL, Lausanne
  • G. Arduini, H. Burkhardt, H. Damerau, W. Höfle, E. Métral, G. Papotti, G. Rumolo, B. Salvant, R. Tomás, S.M. White
    CERN, Geneva
  • R. Calaga, R. De Maria
    BNL, Upton, Long Island, New York
 
 

The upgrade of the CERN Large Hadron Collider (LHC) would require a four- to fivefold increase of the single bunch intensity presently obtained in the Super Proton Synchrotron (SPS). Operating at such high single bunch intensities requires a detailed knowledge of the sources of SPS beam coupling impedance, so that longitudinal and transverse impedance reduction campaigns can be planned and performed effectively if needed. In this paper, the transverse impedance of the SPS is studied by injecting a single long bunch into the SPS, and observing its decay without RF. This particular setup enhances the resolution of the frequency analysis of the longitudinal and transverse bunch signals acquired with strip line couplers connected to a fast data acquisition. It also gives access to the frequency content of the transverse impedance. Results from measurements with short and long bunches in the SPS performed in 2008 are compared with simulations and theoretical predictions.

 
FR5RFP048 An Update of ZBASE, the CERN Impedance Database 4643
 
  • B. Salvant
    EPFL, Lausanne
  • H. Medina, E. Métral, G. Rumolo, B. Salvant
    CERN, Geneva
 
 

A detailed knowledge of the beam coupling impedance of the CERN synchrotrons is required in order to identify the impact on instability thresholds of potential changes of beam parameters, as well as additions, removal or modifications of hardware. To this end, an update of the impedance database was performed, so that impedance results from theoretical calculations using new multilayer models, impedance results from electromagnetic field simulations and impedance results from bench measurements can be compiled. In particular, the impedance database is now set to separately produce the dipolar and quadrupolar transverse impedance and wakes that the HEADTAIL simulation code needs to accurately simulate the effect of the impedance on the beam dynamics.

 
FR5RFP050 Beam Instabilities Studies at Transition Crossing in the CERN Proton Synchrotron 4649
 
  • S. Aumon, W. Bartmann, S.S. Gilardoni, E. Métral, G. Rumolo, R.R. Steerenberg
    CERN, Geneva
  • B. Salvant
    EPFL, Lausanne
 
 

The CERN PS crosses transition energy at about 6 GeV by using a second order gamma jump performed with special quadrupoles. However, for high-intensity beams, and in particular the single bunch beam for the neutron Time-of-Flight facility, a controlled longitudinal emittance blow-up is still needed to prevent a fast single-bunch vertical instability from developing near transition. A series of studies have been done in the PS in 2008 to measure the beam behaviour near transition energy for different settings of the gamma transition jump. The purpose of this paper is to compare those measurements with simulations results from the HEADTAIL code, which should allow to understand better the different mechanisms involved and maybe improve the transition crossing.

 
FR5RFP053 Update on Fast Ion Instability Simulations for the CLIC Main Linac 4658
 
  • G. Rumolo, D. Schulte
    CERN, Geneva
 
 

The specification for vacuum pressure in the CLIC electron Main Linac critically depends on the fast ion instability. In fact, the maximum tolerable pressure value in the pipe of the Main Linac is dictated by the threshold above which the fast ion instability sets in over a CLIC bunch train. Previous calculation based on ion generation from residual gas ionization alone showed that, due to the loss of the trapping along the linac caused by the beam size shrinking from acceleration, a pressure as high as 10 nTorr could be accepted, higher than the tolerable value in the long transfer line. However, since the accelerated beam becomes transversely very small, its electric field can reach values above the field ionization threshold. When this happens, the whole space region with a sufficiently high electric field gets instantly fully ionized by the first bunch and the effect on the bunch train could be severe. We have modeled field ionization in our simulation code FASTION and re-evaluated the onset of fast ion instability in the Main Linac.

 
FR5RFP054 Multi-Bunch Simulations with HEADTAIL 4661
 
  • G. Rumolo, E. Métral
    CERN, Geneva
 
 

The HEADTAIL code has been used for many years to study the interaction of a single bunch with a localized or lumped source of electromagnetic perturbation, usually self-induced (impedance, electron cloud or space charge). It models the bunch as macroparticles and at each turn slices up the bunch into several adjacent charged disks, which are made to subsequently interact with the perturbing agent. A first step toward the extension of HEADTAIL to multi-bunch simulations is presented in this paper. In this case, the bunches themselves are modeled as charged disks and are not sliced, which makes us lose information on the intra-bunch motion but can describe a zero mode interaction between different bunches in a train. The interaction of an SPS bunch train of 72 bunches with the resistive wall or a narrow-band impedance is studied as an example.

 
FR5RFP076 Initial Results of Simulation of a Damping System for Electron Cloud-Driven Instabilities in the CERN SPS 4713
 
  • J.R. Thompson, J.M. Byrd
    LBNL, Berkeley, California
  • W. Höfle, G. Rumolo
    CERN, Geneva
 
 

Funding: Supported by the U.S. Department of Energy under Contract No. DE-AC02-05CH11231.


Single and multi-bunch instabilities on bunch trains driven by electron clouds have been observed in the CERN SPS for some years. In this paper, we present initial results to implement a damping system in a computer simulation of a single bunch vertical instability using the HEADTAIL code. The code simulates the interaction between a proton bunch and a uniform electron cloud that has built up inside of the beam pipe. In all simulations we use typical SPS parameter sets for three different values of the beam momentum : 26 GeV/c, 55 GeV/c and 120 GeV/c. The feedback is implemented as a corrective kick calculated from the vertical centroid of each slice of the electron bunch with a one turn delay. The bandwidth of the feedback is varied by filtering the slice information along the bunch. Initial results indicate that the instability can be damped with a minimum bandwidth of 300 MHz with a relatively high gain.

 
FR5RFP077 Simulation of a Feedback System for the Attenuation of e-Cloud Driven Instability 4716
 
  • J.-L. Vay, M.A. Furman
    LBNL, Berkeley, California
  • R. De Maria
    BNL, Upton, Long Island, New York
  • J.D. Fox, C.H. Rivetta
    SLAC, Menlo Park, California
  • G. Rumolo
    CERN, Geneva
 
 

Funding: Supported by the US-DOE under Contract DE-AC02-05CH11231 and the US-LHC LARP. Used resources of NERSC, supported by the US-DOE under Contract DE-AC02-05CH11231.


Electron clouds impose limitations on current accelerators that may be more severe for future machines, unless adequate measures of mitigation are taken. Recently, it has been proposed to use feedback systems operating at high frequency (in the GHz range) to damp single-bunch transverse coherent oscillations that may otherwise be amplified during the interaction of the beam with ambient electron clouds. We have used the simulation package WARP-POSINST to study the growth rate and frequency patterns in space-time of the electron cloud driven beam breakup instability in the CERN SPS accelerator with, or without, an idealized feedback model for damping the instability. We will present our latest results and discuss their implications for the design of the actual feedback system.

 
FR5RFP049 Coupling Impedance of the CERN SPS Beam Position Monitors 4646
 
  • B. Salvant
    EPFL, Lausanne
  • D. Alesini, M. Migliorati, B. Spataro
    INFN/LNF, Frascati (Roma)
  • G. Arduini, C. Boccard, F. Caspers, A. Grudiev, O.R. Jones, E. Métral, G. Rumolo, B. Salvant, C. Zannini
    CERN, Geneva
  • R. Calaga
    BNL, Upton, Long Island, New York
  • F. Roncarolo
    UMAN, Manchester
 
 

A detailed knowledge of the beam coupling impedance of the CERN Super Proton Synchrotron (SPS) is required in order to operate this machine with a higher intensity for the foreseen Large Hadron Collider (LHC) luminosity upgrade. A large number of Beam Position Monitors (BPM) is currently installed in the SPS, and this is why their contribution to the SPS impedance has to be assessed. This paper focuses on electromagnetic simulations and bench measurements of the longitudinal and transverse impedance generated by the horizontal and vertical BPMs installed in the SPS machine.