TU6RFP023 Installation and Hardware Commissioning of the Multi-Turn Extraction at the CERN Proton Synchrotron 1581
 
  • S.S. Gilardoni, D. Allard, M.J. Barnes, O.E. Berrig, A. Beuret, D. Bodart, P. Bourquin, R. Brown, M. Caccioppoli, F. Caspers, J.-M. Cravero, C.G.A. Dehavay, T. Dobers, M. Dupont, G. Favre, T. Fowler, F. Franchi, M. Giovannozzi, J. Hansen, M. Karppinen, C. Lacroix, E. Mahner, V. Mertens, J. Monteiro, R. Noulibos, E. Page, R. Principe, C. Rossi, L. Sermeus, R.R. Steerenberg, G. Vandoni, G. Villiger, Th. Zickler, C. de Almeida Martins
    CERN, Geneva
 
 

The implementation of new Multi-turn extraction at the CERN Proton Synchrotron required major hardware changes for the nearly 50-year old accelerator. The installation of new PFNs and refurbished kicker magnets for the extraction, new sextupole and octupole magnets, new power converters, together with an in-depth review of the machine aperture leading to the design of new vacuum chambers was required. As a result, a heavy programme of interventions had to be scheduled during the winter shut-down 2007-8. The newly installed hardware and its commissioning is presented and discussed in details.

 
FR5REP052 Construction Status of Linac4 4884
 
  • F. Gerigk, C. Carli, R. Garoby, K. Hanke, A.M. Lombardi, R. Maccaferri, S. Maury, S. Ramberger, C. Rossi, M. Vretenar
    CERN, Geneva
 
 

The civil engineering works of the Linac4 linear accelerator at CERN started in October 2008 and regular machine operation is foreseen for 2013. Linac4 will accelerate H- ions to an energy of 160 MeV for injection into the PS Booster (PSB). It will thus replace the ageing Linac2, which presently injects at 50 MeV into the PSB, and it will also represents the first step in the injector upgrade for the LHC aiming at increasing its luminosity. This paper reports on the status of the design and construction of the main machine elements, which will be installed in the linac tunnel from the beginning of 2012 onwards, on the progress of the civil engineering and on the ongoing activities at the Linac4 test stand.