Paper | Title | Page |
---|---|---|
TU6RFP075 | Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker | 1723 |
|
||
The goal of the present CLIC Test Facility (CTF3) is to demonstrate the technical feasibility of specific key issues in the CLIC scheme. The extracted drive beam from the combiner ring (CR), of 35 A in magnitude and 140 ns duration, is sent to the new CLic EXperimental area (CLEX) facility. A Tail Clipper (TC) is required, in the CR to CLEX transfer line, to allow the duration of the extracted beam pulse to be adjusted. Fours sets of striplines are used for the tail clipper, each consisting of a pair of deflector plates driven to equal but opposite potential. The tail clipper kick must have a fast field rise-time, of not more than 5 ns, in order to minimize uncontrolled beam loss. High voltage MOSFET switches have been chosen to meet the demanding specifications for the semiconductor switches for the modulator of the tail clipper. This paper discusses the design of the modulator; measurement data obtained during testing and operation of the tail clipper is presented and analyzed. |