A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Proch, D.

Paper Title Page
TU5PFP056 Control System Design for Automatic Cavity Tuning Machines 953
 
  • R.H. Carcagno, T.N. Khabiboulline, S. Kotelnikov, A. Makulski, R. Nehring, J.M. Nogiec, M.C. Ross, W. Schappert
    Fermilab, Batavia
  • A. Goessel, J. Iversen, D. Klinke, G. Kreps, W.-D. Möller, C. Mueller, D. Proch, J.H. Thie
    DESY, Hamburg
 
 

A series of four automatic tuning machines for 9-cell TESLA-type cavities are being developed and fabricated through a collaboration between DESY, FNAL and KEK. These machines are intended to support high-throughput cavity fabrication for construction of large SRF-based accelerator projects. Two of these machines will be delivered to cavity vendors for the tuning of XFEL cavities. The control system for these machines must support a high level of automation adequate for industrial use by non-expert operators. This paper describes the control system hardware and software designs, and shows preliminary results obtained with a tuning machine prototype.

 
WE5PFP050 Preparations for Assembly of the International ERL Cryomodule at Daresbury Laboratory 2113
 
  • P.A. McIntosh, R. Bate, C.D. Beard, D.M. Dykes, S.M. Pattalwar
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • S.A. Belomestnykh, M. Liepe, H. Padamsee, J. Sears, V.D. Shemelin, V. Veshcherevich
    CLASSE, Ithaca, New York
  • A. Büchner, F.G. Gabriel, P. Michel
    FZD, Dresden
  • M.A. Cordwell, J. Strachan
    STFC/DL, Daresbury, Warrington, Cheshire
  • J.N. Corlett, D. Li, S.M. Lidia
    LBNL, Berkeley, California
  • T. Kimura, T.I. Smith
    Stanford University, Stanford, California
  • D. Proch, J.K. Sekutowicz
    DESY, Hamburg
  • A. Quigley
    STFC/DL/SRD, Daresbury, Warrington, Cheshire
 
 

The collaborative development of an optimised cavity/cryomodule solution for application on ERL facilities, has now progressed to final assembly and testing of the cavity string components and their subsequent cryomodule integration. This paper outlines the verification of the various cryomodule sub-components and details the processes utilised for final cavity string integration. The paper also describes the modifications needed to facilitate this new cryomodule installation and ultimate operation on the ALICE facility at Daresbury Laboratory.