TU6RFP023 Installation and Hardware Commissioning of the Multi-Turn Extraction at the CERN Proton Synchrotron 1581
 
  • S.S. Gilardoni, D. Allard, M.J. Barnes, O.E. Berrig, A. Beuret, D. Bodart, P. Bourquin, R. Brown, M. Caccioppoli, F. Caspers, J.-M. Cravero, C.G.A. Dehavay, T. Dobers, M. Dupont, G. Favre, T. Fowler, F. Franchi, M. Giovannozzi, J. Hansen, M. Karppinen, C. Lacroix, E. Mahner, V. Mertens, J. Monteiro, R. Noulibos, E. Page, R. Principe, C. Rossi, L. Sermeus, R.R. Steerenberg, G. Vandoni, G. Villiger, Th. Zickler, C. de Almeida Martins
    CERN, Geneva
 
 

The implementation of new Multi-turn extraction at the CERN Proton Synchrotron required major hardware changes for the nearly 50-year old accelerator. The installation of new PFNs and refurbished kicker magnets for the extraction, new sextupole and octupole magnets, new power converters, together with an in-depth review of the machine aperture leading to the design of new vacuum chambers was required. As a result, a heavy programme of interventions had to be scheduled during the winter shut-down 2007-8. The newly installed hardware and its commissioning is presented and discussed in details.