Paper | Title | Page |
---|---|---|
MO3GRI02 | Neutron-Rich Beams from 252Cf Fission at ATLAS - The CARIBU Project | 65 |
|
||
Funding: This work was supported by the U.S. Department of Energy, Office of Nuclear Physics, under Contract No. DE-AC02-06CH11357. Construction of the DOE Californium Rare Ion Breeder Upgrade (CARIBU) for the ATLAS facility is expected to be completed by the end of 2008 and commissioning should be well along by the time of the conference. The facility will use fission fragments from a 1 Ci 252Cf source, thermalized and collected into a low-energy particle beam by a helium gas catcher, mass analyzed by an isobar separator, and charge breed to higher charge states for acceleration in ATLAS. In addition, unaccelerated beams will be available for trap and laser probe studies. Expected yields of accelerated beams are up to ~5x105 (107 to traps) far-from-stability ions per second on target. The facility design and first results of beam acceleration using a weaker 80 mCi source will be presented in this paper and plans for installation of the 1 Ci source will be discussed. |
||
|