A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Pasky, S.J.

Paper Title Page
TU5PFP003 A New SLED Test Stand in the APS Injector Linac 806
 
  • S.J. Pasky, A.R. Cours, A.E. Grelick, A.F. Pietryla, N. Sereno, T.L. Smith, W.D. Wright
    ANL, Argonne
 
 

Funding: Work supported by U.S.Department of Energy, Office of Science, Office of Basic Energy Science, under Contract No. DE-AC02-06CH 11357


Recently, a new SLED test stand located in the Advanced Phone Source linac klystron gallery was developed using a spare modulator-klystron system and a recently developed prototype water station. The new test stand will be used to condition, tune and perform rf measurements on spare SLEDs without interfering with normal daily linac operations. This will allow technical groups to replace a low-performance SLED from one of the operational linac sectors with a fully conditioned SLED. The pre-conditioned SLED is expected to require less conditioning time after being put into operation compared to an unconditioned SLED. As an additional benefit, the prototype water station system developed to replace aging linac water systems can be tested under realistic conditions. In this paper, we describe the test stand design, prototype water station system, and first results using it to condition SLEDs and perform SLED rf measurements.

 
TH5RFP043 Mitigation of COTR due to the Microbunching Instability in Compressed Electron Beams 3546
 
  • A.H. Lumpkin
    Fermilab, Batavia
  • W. Berg, Y.L. Li, S.J. Pasky, N. Sereno
    ANL, Argonne
 
 

Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.


The challenge of mitigating the strong enhancements of the optical transition radiation (OTR) signal observed after bunch compression in the Advanced Photon Source (APS) linac chicane and at the Linac Coherent Light Source (LCLS) has recently been addressed. We have demonstrated a technique to mitigate the intensity of the coherent OTR (COTR) relative to the OTR signals on the APS beams at 325 MeV. Since the previously reported spectral content of the COTR at LCLS after the first compression stage is similar, the concepts should also apply to LCLS. We utilized the stronger violet content at 400 nm of the OTR compared to the observed gain factors of the COTR in the blue to NIR regime. We also demonstrated the use of an LSO:Ce scintillator that emits violet light to support lower-charge imaging. Spectral-dependence measurements of the COTR were done initially at the 325-MeV station using a series of band pass filters inserted before the CCD camera, but recent tests with an Oriel spectrometer with ICCD readout have extended those studies and confirmed the concepts. These techniques are complementary to the proposed use of a laser heater to mitigate the microbunching itself at LCLS.