A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Park, S.J.

Paper Title Page
TU6RFP088 Design of Electron Gun System for the PLS-II Linear Accelerator 1751
 
  • Y.G. Son, K.R. Kim, S.H. Nam, S.J. Park
    PAL, Pohang, Kyungbuk
  • T. Asaka
    JASRI/SPring-8, Hyogo-ken
 
 

Funding: This work was supported by the MEST (Ministry of Education, Science and Technology) and the POSCO (POhang iron and Steel making COmpany) in Korea.


The PLS-II, the major upgrade program of the PLS (Pohang Light Source, a 2.5-GeV 3rd generation light source), is planned at the Pohang Accelerator Laboratory. The PLS 2.5-GeV linear accelerator, being the full-energy injector for the PLS storage ring, should be upgraded to provide the beam energy of 3 GeV. For the PLS-II linac, we are going to establish a dual electron gun system in which two guns will be on the accelerator beamline with a bending magnet enabling immediate switching of guns. The dual gun system is expected to achieve high reliability for the top-up injection to the PLS-II storage ring. Also the gun will be upgraded to provide the beam energy of 200 keV and a pulse high-voltage modulator will be constructed. Fifteen-section PFNs will be connected in series to make final impedance of approximately 17.3 ohm. A new modulator applying the inverter technology will be used to charge the PFN and obtain more stable charging performances. In this article the authours would like to report on the design status of the accelerator beamline and inverter modulator for the dual gun system.

 
FR5REP019 Developing of PBPM Data Acquisition Control System for the PLS 4808
 
  • J.C. Yoon, C. Kim, K.R. Kim, S.J. Park
    PAL, Pohang, Kyungbuk
 
 

The prototypes of PBPM of the four blade types were installed in front-ends 1C1 diagnostic beam line. The four-blade PBPM measure both the horizontal and the vertical positions of the photon beam. KeithleyTM picoammeters are used to record the blade current. The position in both vertical and horizontal directions is calibrated by driving the stepping motors of the PBPM through an Industrial computer. PBPM Data Acquit ion Control System (DACS) is based on Window XP platform. The DACS is equipped with an Ethernet-to-GPIB controller (GPIB-ENET/00). Using the GPIB-ENET/100, networked computers can communicate with and control IEEE 488 devices from anywhere on an Ethernet-based TCP/IP network. This is GPIB interfaces four picoammeters and Ethernet-based TCP/IP communicates by Industrial Computer. Developing with LabVIEW for Windows XP, the interface to EPICS is accomplished by means of Win32 channel Access DLL's. Our LabVIEW application program incorporates EPICS-based motor control and PC-based data acquisition, using a National Instruments I/O board, and saves position data to txt files. This paper presents the PBPM DACS for PLS Control System.

 
FR5REP080 Commissioning Status of 10-MeV Intense Electron Linac 4965
 
  • S.H. Kim, M.-H. Cho, W. Namkung, H.R. Yang
    POSTECH, Pohang, Kyungbuk
  • S.D. Jang, S.J. Park, Y.G. Son
    PAL, Pohang, Kyungbuk
  • J.-S. Oh
    NFRI, Daejon
 
 

Funding: This work is supported by KAPRA and POSTECH Physics BK21 Program.


An intense L-band electron linac is now being commissioned at ACEP (Advanced Center for Electron-beam Processing in Cheorwon, Korea) for irradiation applications. It is capable of producing 10-MeV electron beams with the 30-kW average beam power. For a high-power capability, we adopted the traveling-wave structure operated with the 2π/3-mode at 1.3 GHz. The structure is powered by a 25-MW pulsed klystron with 60-kW average RF power. The RF pulse length is 8 μs while the beam pulse length is 7 μs due to the filling time in the accelerating structure. The accelerating gradient is 4.2 MV/m at the beam current of 1.45 A which is the fully beam-loaded condition. In this paper, we present details of the accelerator system and commissioning status.