A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Ohsawa, Y.

Paper Title Page
TH5RFP085 Tunnel and Magnet Survey of KEKB after Ten Years of Operation 3648
 
  • M. Masuzawa, Y. Ohsawa, N. Ohuchi
    KEK, Ibaraki
 
 

KEKB is a double-ring collider with a circumference of 3016 m. The two rings were built side-by-side in the TRISTAN tunnel, 11 m below ground. KEKB has been operating successfully for about 10 years, since 1999, and its peak luminosity continues to improve. During the summer shutdown of 2008, the magnet tilts were measured for the first time since installation and it was found that some magnets were rotated over time. The tunnel level marker and the magnet height were also surveyed. The south region of the tunnel is sinking, resulting in magnet level changes. The survey results will be reported in this paper.