TU5PFP056 | Control System Design for Automatic Cavity Tuning Machines | 953 |
|
||
A series of four automatic tuning machines for 9-cell TESLA-type cavities are being developed and fabricated through a collaboration between DESY, FNAL and KEK. These machines are intended to support high-throughput cavity fabrication for construction of large SRF-based accelerator projects. Two of these machines will be delivered to cavity vendors for the tuning of XFEL cavities. The control system for these machines must support a high level of automation adequate for industrial use by non-expert operators. This paper describes the control system hardware and software designs, and shows preliminary results obtained with a tuning machine prototype. |
||
TU6RFP050 | Monitoring the FLASH Cryomodule Transportation from DESY Hamburg to CEA Saclay: Coupler Contact, Vacuum, Acceleration and Vibration Analysis | 1659 |
|
||
With a view to the series production of one hundred, 12 m long XFEL 1.3 GHz cryomodules and their transportation from the assembly site at CEA Saclay (F) to the installation site at DESY Hamburg (D) a test transportation of a FLASH cryomodule has been performed, in the condition foreseen for the mass transportation. The present study examines the stresses induced on the module and verify the damping capabilities of the transport frame in order to minimize risk of damage to the most critical components. During the transportation, acceleration and vibration have been monitored as well as coupler antenna contacts and vacuum performances. This paper describes the analysis performed and compares those results to the data of a similar transportation study at Fermilab for the CM1 cryomodule. |