Molaro, D.M.

Paper Title Page
TU6RFP019 Elettra Booster Magnet Power Supplies: One Year of Operations 1571
 
  • R. Visintini, D.M. Molaro
    ELETTRA, Basovizza
 
 

The New Full-Energy Injector at Elettra, based on a 3 Hz, 100 MeV to 2.5 GeV booster has officially started its operations since March 2008*. The time schedule was fully respected notwithstanding the performance problems presented by some of the main magnet power supplies**. The refurbishing plan, formally started at the end of the commissioning phase and carried on together with the manufacturer, has brought positive results in approaching the required specifications. The paper will describe the progress of the refurbishing and the experience with the other magnet power supplies, including the positive performances of the in-house low-current (5A) bipolar power supplies, especially designed for the linac pre-injector***. A new version, fully digitally controlled, of these low-power power supplies will be adopted for some coils and magnets of the FERMI@Elettra project.


*M. Svandrlik, Status of the Elettra Booster Project, EPAC08
**R. Visintini, Magnet power converters for the Elettra Booster, EPAC08
***D. Molaro, A new bipolar PS for the Elettra booster, PCIM08

 
TU6RFP020 Magnet Power Supplies for FERMI@Elettra 1574
 
  • R. Visintini, M. Cautero, D.M. Molaro
    ELETTRA, Basovizza
 
 

Funding: The work was supported in part by the Italian Ministry of University and Research under grant FIRB-RBAP045JF2


FERMI@Elettra is the new 4th-generation light source, based on a single-pass FEL, under construction at the Elettra Laboratory in Trieste, Italy. Some hundreds of magnets and coils need to be supplied along the accelerator sections and the undulators chains - mostly individually - with currents as low as 1.5 A up to 750 A. Starting from a successful design developed at Elettra* for the full-energy injector**, a new version of the existing 4-quadrant, 5 A PS has been studied. This new bipolar low-current PS, with full digital control, will be adopted for all 1.5 A and 5 A loads. The design of a bipolar PS for supplying the 20 A loads is in progress. This paper will describe the proposed PS system for the magnets and coils of FERMI@Elettra. The focus will be on the solutions adopted to minimize the number of different PS types. Particular stress will be laid upon the in-house design.


*D, Molaro et al. - A new bipolar power supply for Elettra booster pre-injector correctors - PCIM08
**R. Visintini et al. - Magnet power converters for the new Elettra full energy injector - EPAC08