Mardor, I.

Paper Title Page
FR5REP087 Status of the SARAF CW 40 MeV Proton/Deuteron Accelerator 4981
 
  • I. Mardor, D. Berkovits, I. Gertz, A. Perry, J. Rodnizki, L. Weissman
    Soreq NRC, Yavne
  • K. Dunkel, F. Kremer, M. Pekeler, C. Piel, P. vom Stein
    ACCEL, Bergisch Gladbach
 
 

The Soreq Applied Research Accelerator Facility, SARAF, is currently under construction at Soreq NRC. SARAF is based on a continuous wave (CW), proton/deuteron RF superconducting linear accelerator with variable energy (5–40 MeV) and current (0.04-2 mA). SARAF is designed to enable hands-on maintenance, which implies beam loss below 10-5 for the entire accelerator. Phase I of SARAF consists of a 20 keV/u ECR ion source, a low energy beam transport section, a 4-rod RFQ, a medium energy (1.5 MeV/u) transport section, a superconducting module housing 6 half-wave resonators and 3 superconducting solenoids, a diagnostic plate and a beam dump. Phase II will include 5 additional superconducting modules. The ECR source is in routine operation since 2006, the RFQ is in routine operation with protons since 2008 and has been further operated with molecular hydrogen and deuterons. The superconducting module is being operated and characterized with protons. Phase I commissioning results, their comparison to beam dynamics simulations and Phase II plans will be presented.