TU6RFP022 | First Results for the Beam Commissioning of the CERN Multi-Turn Extraction | 1578 |
|
||
The Multi-Turn Extraction, a new type of extraction based on beam trapping inside stable islands in the horizontal phase space, has been commissioned during the 2008 run of the CERN Proton Synchrotron. Both single- and multi-bunch beams with a total intensity up to 1.4×1013 protons have been extracted with efficiencies up to 98%. Furthermore, injection tests in the CERN Super Proton Synchrotron were performed, with the beam then accelerated and extracted to produce neutrinos for the CERN Neutrino to Gran Sasso experiments. The results of the extensive measurement campaign are presented and discussed in details. |
||
TH6PFP073 | Controlled Transverse Emittance Blow-Up in the CERN SPS | 3871 |
|
||
For several years, a large variety of beams have been prepared in the LHC injectors, such as single-bunch and multi-bunch beams, with 25 ns, 50 ns and 75 ns bunch spacings, nominal and intermediate intensities per bunch. As compared to the nominal LHC beam (i.e. with nominal bunch intensity and 25 ns spacing) the other beams can be produced with lower transverse emittances. Beams of low transverse emittances are of interest during the commissioning phase for aperture considerations and because of the reduced long-range beam-beam effects. On the other hand machine protection considerations might lead to prefer nominal transverse emittances for safe machine operations. The purpose of this paper is to present the results of controlled transverse emittance blow-ups using the transverse feedback and octupoles. The procedures tested in the SPS in 2008 allow to tune the transverse emittances up to nominal values at SPS extraction. |
||
FR1RAC04 | Achievements in CTF3 and Commissioning Status | 4210 |
|
||
The aim of the last CLIC test facility CTF3, built at CERN by an international collaboration, is to prove the main feasibility issues of the CLIC two-beam acceleration technology. The main points which CTF3 should demonstrate by 2010 are the generation of a very high current drive beam and its use to efficiently produce and transfer RF power to high-gradient accelerating structures. To prove the first point a delay loop and a combiner ring have been built, following a linac, in order to multiply the current by a factor two and four, respectively. The power generation and transfer and the high gradient acceleration are instead demonstrated in the CLIC experimental area (CLEX), where the drive beam is decelerated in special power extraction structures(PETS). In this paper we describe the results of the combination in the ring, properly working after the cure of the vertical instability which limited high current operation, and the commissioning of the new beam lines installed in the second half of 2008, including response matrix analysis and dispersion measurements used to validate the optics model. The results of the energy transfer will be also briefly described. |
||
|