MO3RAI03 Construction and Commissioning of BEPCII 33
 
  • C. Zhang, L. Ma, G. Pei, J.Q. Wang
    IHEP Beijing, Beijing
 
 

BEPCII is major upgrades of BEPC (Beijing Electron-Positron Collider). It is a double ring e±e collider as well as a synchrotron radiation (SR) source with its outer ring, or SR ring. As a collider, BEPCII operates in the beam energy region of 1-2.1 GeV with design luminosity of 1*1033cm-2s-1 at 1.89 GeV. As a light source, the SR ring operates at 2.5 GeV and 250 mA. Construction of the project started in the beginning of 2004. Installation of the storage ring components completed in October 2007. The BESIII detector was moved to the Interaction Region (IR) on May 6, 2008. In accordance to the progress of construction, the beam commissioning of BEPCII is carried out in 3 phases: Phase 1, with conventional magnets instead of the superconducting insertion magnets (SIM’s)n in the IR; Phase 2, with SIM’s in the IR; Phase 3, joint commissioning with the detector. The maximum luminosity reached to 2.3*1032cm-2s-1. This paper summarizes progress of the construction and commissioning in 3 phases, while focusing on the third phase.


* On behalf of the BEPCII Team

 

slides icon

Slides

 
TH6REP082 Experiment of Transverse Feedback System at HLS 4147
 
  • J.H. Wang, Y.B. Chen, W. Li, L. Liu, M. Meng, B. Sun, L. Wang, Y.L. Yang, Z.R. Zhou
    USTC/NSRL, Hefei, Anhui
  • J. Cao, J. Yue
    IHEP Beiing, Beijing
  • D.K. Liu
    SINAP, Shanghai
  • L. Ma
    IHEP Beijing, Beijing
  • K.R. Ye
    SSRF, Shanghai
 
 

In this paper, we introduce the BxB transverse feedback systems at Hefei Light Source (HLS), which employ an analog system and a digital system. The construction and commissioning for two feedback systems, as well as the instability analysis of beam and the experiment result of the feedback system in HLS are also presented in this paper.