Paper | Title | Page |
---|---|---|
MO6PFP011 | Imperfection Investigation for the Main Magnet Construction for Compact Cyclotron | 154 |
|
||
CYCIAE-100 is a 100 MeV, 200 muA H- cyclotron being constructed at CIAE. The tolerance of the magnetic field is as tight as 1.2 Gauss for isochronous field and 2 Gauss for first harmonics. Due to the absence of coil adjusting in this machine, a measure that helps to achieve a more compact structure (435 ton for the main magnet), the imperfection hence becomes a much more critical factor in our consideration. The effects by the various kinds of imperfection are investigated numerically and the imperfection fields are predicted for beam dynamics simulation, serving as a basic guidance in the magnet construction for CYCIAE-100. Some of the important results will be reported in this paper, including
|