A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Liu, X.

Paper Title Page
MO6RFP005 CesrTA Vacuum System Modifications 357
 
  • Y. Li, X. Liu, V. Medjidzade, M.A. Palmer, D.H. Rice, D. L. Rubin, J.J. Savino
    CLASSE, Ithaca, New York
 
 

Funding: Work supported by the National Science Foundation, the US Department of Energy, and the Japan/US Cooperation Program


In concert with the ILC global design effort, the CESR is being converted into ILC Damping Ring Test Accelerator. The vacuum system is undergoing staged reconfigurations to support both the CesrTA physics goals and the CHESS X-ray sources. Six superconducting wigglers were moved to a sector with zero-dispersion. The sector is densely populated with beam instrumentation and diagnostic devices. A new photon stop chamber will be used to handle the high synchrotron radiation power generated from the SCWs at high positron beam energy. A 12-m long gate-valve isolated straight sector was created in a second location, where many electron-cloud diagnostic chambers will be installed and tested. We also configured two very short sections in the arcs, with additional gate valves, to provide flexibility of exchanging various meter-long test chambers with minimum impact to the operations. Many retarding field analyzers were integrated into the vacuum modifications in SCWs, dipoles, and drifts to study EC growth and suppression techniques. Creating environments where both local and collaborator provided equipment can be easily installed has been a major objective in the modifications.

 
TU2GRI01 Initial Beam Results from the Cornell High-Current ERL Injector Prototype 683
 
  • I.V. Bazarov, S.A. Belomestnykh, E.P. Chojnacki, J. Dobbins, B.M. Dunham, R.D. Ehrlich, M.J. Forster, C.M. Gulliford, G.H. Hoffstaetter, Y. Li, M. Liepe, X. Liu, F. Löhl, D.G. Ouzounov, H. Padamsee, D.H. Rice, V.D. Shemelin, E.N. Smith, K.W. Smolenski, M. Tigner, V. Veshcherevich
    CLASSE, Ithaca, New York
  • H. Li
    Cornell University, Ithaca, New York
  • H. K. Sayed
    JLAB, Newport News, Virginia
 
 

Cornell University has built a high average current electron injector for use with an Energy Recovery Linac. The injector is capable of up to 100 mA average current at 5 MeV (33 mA at 15 MeV) and is expected to produce the ultra low emittances needed for an ERL. This talk will give an overview of the initial performance of this injector and summarize a spectrum of beam physics experiments undertaken to demonstrate low emittance, high average current operation.

 

slides icon

Slides

 
TH5RFP030 Design, Implementation and First Results of Retarding Field Analyzers Developed for the CESRTA Program 3510
 
  • M.A. Palmer, M.G. Billing, J.R. Calvey, G.W. Codner, S. Greenwald, Y. Li, X. Liu, J.A. Livezey, R.E. Meller, R.M. Schwartz, J.P. Sikora, C.R. Strohman, W.S. Whitney, T. Wilksen
    CLASSE, Ithaca, New York
 
 

Funding: Support provided by the US National Science Foundation and the US Department of Energy.


A central component of the operation of the Cornell Electron Storage Ring as a Test Accelerator (CesrTA) for ILC Damping Rings R&D is the characterization of electron cloud growth in each of the principal vacuum chamber types in use in the storage ring. In order to facilitate measurements in chambers with tightly constrained external apertures, retarding field analyzers have been developed that can be deployed in regions with as little as 3mm of available aperture. We report on the design, fabrication, characterization and operation of devices that are presently deployed in CESR drift, dipole, and wiggler chambers.

 
FR1RAI02 The Conversion and Operation of the Cornell Electron Storage Ring as a Test Accelerator (CesrTA) for Damping Rings Research and Development 4200
 
  • M.A. Palmer, J.P. Alexander, M.G. Billing, J.R. Calvey, S.S. Chapman, G.W. Codner, C.J. Conolly, J.A. Crittenden, J. Dobbins, G. Dugan, E. Fontes, M.J. Forster, R.E. Gallagher, S.W. Gray, S. Greenwald, D.L. Hartill, W.H. Hopkins, J. Kandaswamy, D.L. Kreinick, Y. Li, X. Liu, J.A. Livezey, A. Lyndaker, V. Medjidzade, R.E. Meller, S.B. Peck, D.P. Peterson, M.C. Rendina, P. Revesz, D.H. Rice, N.T. Rider, D. L. Rubin, D. Sagan, J.J. Savino, R.D. Seeley, J.W. Sexton, J.P. Shanks, J.P. Sikora, K.W. Smolenski, C.R. Strohman, A.B. Temnykh, M. Tigner, S. Vishniakou, W.S. Whitney, T. Wilksen, H.A. Williams
    CLASSE, Ithaca, New York
  • J.M. Byrd, C.M. Celata, J.N. Corlett, S. De Santis, M.A. Furman, A. Jackson, R. Kraft, D.V. Munson, G. Penn, D.W. Plate, A.W. Rawlins, M. Venturini, M.S. Zisman
    LBNL, Berkeley, California
  • J.W. Flanagan, P. Jain, K. Kanazawa, K. Ohmi, H. Sakai, K. Shibata, Y. Suetsugu
    KEK, Ibaraki
  • K.C. Harkay
    ANL, Argonne
  • Y. He, M.C. Ross, C.-Y. Tan, R.M. Zwaska
    Fermilab, Batavia
  • R. Holtzapple
    CalPoly, San Luis Obispo, CA
  • J.K. Jones
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • D. Kharakh, M.T.F. Pivi, L. Wang
    SLAC, Menlo Park, California
  • E.N. Smith
    Cornell University, Ithaca, New York
  • A. Wolski
    Cockcroft Institute, Warrington, Cheshire
 
 

Funding: Support provided by the US National Science Foundation, the US Department of Energy, and the Japan/US Cooperation Program.


In March of 2008, the Cornell Electron Storage Ring (CESR) concluded twenty eight years of colliding beam operations for the CLEO high energy physics experiment. We have reconfigured CESR as an ultra low emittance damping ring for use as a test accelerator (CesrTA) for International Linear Collider (ILC) damping ring R&D. The primary goals of the CesrTA program are to achieve a beam emittance approaching that of the ILC Damping Rings with a positron beam, to investigate the interaction of the electron cloud with both low emittance positron and electron beams, to explore methods to suppress the electron cloud, and to develop suitable advanced instrumentation required for these experimental studies (in particular a fast x-ray beam size monitor capable of single pass measurements of individual bunches). We report on progress with the CESR conversion activities, the status and schedule for the experimental program, and the first experimental results that have been obtained.

 

slides icon

Slides