Paper | Title | Page |
---|---|---|
TU6PFP040 | A Compact Ring for Thom X-Ray Source | 1372 |
|
||
The goal of X-ray sources based on Compton back scattering processes is to develop a compact device, which could produce an intense flux of monochromatic X-rays. Compton back-scattering resuls from collisions between laser pulses and relativistic electron bunches. Due to the relative low value of the Compton cross section, a high charge electron beam, a low emittance and a high focusing at the interaction point are required for the electron beam. In addition, the X-ray flux is related to the characteristics of the electron beam, which are themselves dynamically affected by the Compton interaction. One possible configuration is to inject frequently into a storage ring with a low emittance linear accelerator without waiting for the synchrotron equilibrium. As a consequence, the optics should be designed taking into account the characteristics of the electron beam from the linear accelerator. The accelerator ring design for a 50 MeV electron beam, aiming at producing a flux higher than 1013 ph/s, will be presented. |
||
WE5RFP021 | Operation and Performance Upgrade of the SOLEIL Storage Ring | 2312 |
|
||
After two years of operation, the SOLEIL 3rd generation synchrotron light source is delivering photons to 20 beamlines with a current of 250mA in multibunch or hybrid modes, and 60 mA in 8 bunch mode. The radiation control of the beamline hutches is performed at 300 mA, but recently a 455mA current was stored during machine tests following the installation of the second RF cryomodule. It is foreseen to reach the maximum current of 500mA in the early 2009 and to operate in top-up mode from then on. The new transverse feedback loop has enabled to improve the performance of the single bunch and multibunch beams. The beam position stability is in the range of few micrometers thanks to the efficiency of the fast orbit feedback. Fifteen insertion devices are now installed in the storage ring, ten others are under construction, and a cryogenic undulator is under development. A big effort is being taken in order to compensate the effects of these insertion devices on the machine performance. The good operation performance achieved in 2007 (first year) has been improved in 2008 during which ~4 000 hours will have been delivered to the users with a 95.5% availability and a 30 hours MTBF. |