WE5RFP020 | Operational Advances at Elettra and its New Full Energy Injector | 2309 |
|
||
A full energy injector consisting of a 100 MeV linac and an up to 2.5 GeV booster is in operation since March 2008 replacing the previous 1 GeV linac injector to be used after refurbishing and upgrade for the new fourth generation light source (FEL) currently under construction at Sincrotrone Trieste. The measurements on the new injector, problems and solutions employed to increase its efficiency, reproducibility and reliability, aiming towards top-up operations in the near future, and its impact on the Elettra storage ring are presented and discussed. |