Paper | Title | Page |
---|---|---|
MO6RFP014 | Thin Film Coating for the Upgrade of the Ion Synchrotron SIS18 at GSI | 378 |
|
||
Funding: EU design study, contract 515876, DIRAC-PHASE-1, RP6 SIS 18-2 For the future FAIR facility intensities up to 1012 U28+ ions per second are required. For this purpose the existing heavy ion synchrotron SIS18, which will serve as injector, has to be upgraded. Since the required base pressure is 10-10 Pa, among the different measures undertaken to improve the existing UHV system, the installation of NEG coated magnet chambers is foreseen. Two magnetron sputtering facilities were designed and commissioned at GSI to perform the coating. The characterization of the thin films has been carried out by RBS and XPS. Considering that the vacuum chambers mounted in accelerators undergo several venting-activation cycles, a deep investigation on the NEG aging was performed by ERDA. Fourteen dipole and one quadrupole chambers were coated and installed in the SIS 18, and the replacement of the remaining magnet pipes will follow in the next years. Additionally to overcome the dynamic vacuum instability a collimation system equipped with thin film coated absorbers was successfully tested in 2008. The coating facilities, their operating mode, the results achieved on the thin film characterization, and the ones obtained in the SIS 18 are presented. |
||
FR1GRI03 | Advanced Design of the FAIR Storage Ring Complex | 4246 |
|
||
The FAIR storage ring complex comprises three storage rings with a magnetic rigidity of 13 m. Each of the rings, CR, RESR, and NESR, serves specific tasks in the preparation of secondary beams, rare isotopes and antiprotons, or for experiments with heavy ion beams. The CR is optimized for fast stochastic pre-cooling of secondary beams. The RESR design includes optimization of antiproton accumulation. The design of the NESR for experiments with heavy ions, deceleration of ions or antiprotons for a subsequent low energy facility, and the accumulation of rare isotope beams is proceeding. This report summarizes various new concepts conceived in the design process of this new storage ring facility. |
||
|