Paper | Title | Page |
---|---|---|
WE5RFP023 | Status of UVSOR-II and Light Source Developments | 2318 |
|
||
UVSOR, a 750 MeV synchrotron light source of 53m circumference, had been operated for more than 20 years. After a major upgrade in 2003, this machine was renamed to UVSOR-II. The ring is now routinely operated with low emittance of 27 nm-rad and with four undulators. The test run of the top up injection has been started. The latest result will be reported. By utilizing a part of the existing FEL system and an ultra-short laser system, coherent synchrotron radiation and coherent harmonic generation have been extensively studied, under international collaborations. A new program on the coherent light source developments has been started, which includes upgrades of the undulator and the laser system and a construction of dedicated beam-lines. |
||
TU5RFP081 | Status of the Energy Recovery Linac Project in Japan | 1278 |
|
||
Future synchrotron light source project using an energy recovery linac (ERL) is under proposal at the High Energy Accelerator Research Organization (KEK) in collaboration with several Japanese institutes such as the JAEA and the ISSP. We are on the way to develop such key technologies as the super-brilliant DC photo-injector and superconducting cavities that are suitable for both CW and high-current operations. We are also promoting the construction of the Compact ERL for demonstrating such key technologies. We report the latest status of our project, including update results from our photo-injector and from both superconducting cavities for the injector and the main linac, as well as the progress in the design and preparations for constructing the Compact ERL. |