Paper | Title | Page |
---|---|---|
TU6PFP057 | Operational Experience with First Circulating Beam in the LHC | 1412 |
|
||
Following a series of injection tests, the first attempts to pass beam around both directions of the LHC were successful and led rapidly to circulating beam in the counter clockwise direction (beam 2) and many turns of beam 1. Unfortunately the beam commissioning was curtailed by the incident in sector 34. However, measurements performed during this first commissioning period should that the magnet model of the machine had delivered optics close to nominal, and also very good performance of beam instrumentation and supporting software. Details of the machine set-up and the commissioning procedures are detailed. The measurements performed and the key results from this period are described. |
||
TU6RFP024 | Initial Results from Beam Commissioning of the LHC Beam Dump System | 1584 |
|
||
Initial commissioning of the LHC beam dump system with beam took place in August and September 2008. The preparation, setting-up and the tests performed are described together with results of the extractions of beam into the dump lines. Analysis of the first detailed aperture measurements of extraction channels and kicker performance derived from dilution sweep shapes are presented. The performance of the other equipment subsystems is summarised, in particular that of the dedicated dump system beam instrumentation. |
||
TU6RFP026 | Beam Commissioning of Injection into the LHC | 1590 |
|
||
The LHC injection tests and first turn beam commissioning took place in late summer 2008, after detailed and thorough preparation. The beam commissioning of the downstream sections of the SPS-to-LHC transfer lines and the LHC injection systems is described. The details of the aperture measurements in the injection regions are presented together with the performance of the injection related equipment. The measured injection stability is compared to the expectations. The operational issues encountered are discussed. |
||
TU6RFP029 | Experience with the LHC Beam Dump Post-Operational Checks System | 1599 |
|
||
After each beam dump in the LHC automatic post-operational checks are made to guarantee that the last beam dump has been executed correctly and that the system can be declared to be 'as good as new' before the next injection is allowed. The analysis scope comprises the kicker waveforms, redundancy in kicker generator signal paths and different beam instrumentation measurements. This paper describes the implementation and the operational experience of the internal and external post-operational checks of the LHC beam dumping system during the commissioning of the LHC without beam and during the first days of beam operation. |
||
WE6PFP017 | LHC Abort Gap Cleaning with the Transverse Damper | 2519 |
|
||
Funding: Work partly supported by Fermilab, operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy In the Large Hadron Collider LHC, particles not captured by the RF system at injection or leaking out of the RF bucket may quench the superconducting magnets during beam abort. The problem, common to other superconducting machines, is particularly serious for the LHC due to the very large stored energy in the beam. For the LHC a way of removing the unbunched beam has been studied and it uses the existing damper kickers to excite resonantly the particles travelling along the abort gap. In this paper we describe the results of simulations performed with MAD-X for various LHC optics configurations, including the estimated multipolar errors. |
||
WE6PFP021 | First Beta-Beating Measurement in the LHC | 2531 |
|
||
In 2008 beam successfully circulated in the LHC. Thanks to an excellent functioning of the BPM system and the related software, injection oscillations were recorded for the first 90 turns at all BPMs. The analysis of these data gives the unique opportunity of evaluating the periodic optics and inferring possible error sources. |
||
WE6PFP026 | Linear & Nonl. Optics Checks during LHC Injection Tests | 2546 |
|
||
In early LHC commissioning, linear and "higher-order" polarity checks were performed for one octant per beam, by launching suitable free betatron oscillations and then inverting a magnet-circuit polarity or strength. Circuits tested included trim quadrupoles, skew quadrupoles, lattice sextupoles, sextupole spool-pieces, Landau octupoles, and skew sextupoles. A nonzero momentum offset was introduced to enhance the measurement quality. The low-intensity single-pass measurements proved sufficiently sensitive to verify the polarity and the amplitude of (almost) all circuits under investigation, as well as the alignment of individual trim quadrupoles. A systematic polarity inversion detected by this measurement helped to pin down the origin of observed dispersion errors. Later, the periodic "ring dispersion" was reconstructed from the full first-turn trajectory of an injected off-momentum beam, by removing, at each location, the large incoming dispersion mismatch, forward-propagated via the optics model. Various combinations of inverted trim quadrupoles were considered in this model until reaching a good agreement of reconstructed dispersion and prediction. |
||
TH6PFP038 | Determination of the Chromaticity of the TI 8 Transfer Line Based on Kick Response Measurements | 3787 |
|
||
The 3 km long TI 8 transfer line is used to transfer 450 GeV proton and ion beams from the SPS to LHC collider. As part of a detailed optics investigation program the chromaticity of the transfer line was measured. Kick response data of the transfer line was recorded for various extraction energy offsets in the SPS. The quadrupolar and sextupolar field errors over the whole transfer line dipoles, a systematic error of the main quadrupole strengths and the initial momentum error were estimated by a fit. Using the updated model, the chromaticity of the line was then calculated. |
||
TH6PFP040 | Machine Studies During Beam Commissioning of the SPS-to-LHC Transfer Lines | 3793 |
|
||
Funding: Work partly supported by Fermilab, operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy Through May to September 2008, further beam commissioning of the SPS to LHC transfer lines was performed. For the first time, optics and dispersion measurements were also taken in the last part of the lines, and into the LHC. Extensive trajectory and optics studies were conducted, in parallel with hardware checks. In particular dispersion measurements and their comparison with the beam line model were analysed in detail and led to propose the addition of a “dispersion-free” steering algorithm in the existing trajectory correction program. |
||
FR1GRC05 | The LHC Injection Tests | 4254 |
|
||
A series of LHC injection tests was performed in August and September 2008. The first saw beam injected into sector 23; the second into sectors 78 and 23; the third into sectors 78-67 and sectors 23-34-45. The fourth, into sectors 23-34-45, was performed the evening before the extended injection test on the 10th September which saw both beams brought around the full circumference of the LHC. The tests enabled the testing and debugging of a number of critical control and hardware systems; testing and validation of instrumentation with beam for the first time; deployment, and validation of a number of measurement procedures. Beam based measurements revealed a number of machine configuration issues that were rapidly resolved. The tests were undoubtedly an essential precursor to the successful start of LHC beam commissioning. This paper provides an outline of preparation for the tests, the machine configuration and summarizes the measurements made and individual system performance. |
||
|