Paper | Title | Page |
---|---|---|
MO6PFP024 | Permanent Magnet Final Focus Doublet R&D for ILC at ATF2 | 187 |
|
||
Funding: Work partially supported by the Ministry of Education, Science, Sports and Culture, Grant-in-Aid for Scientific Research (A), 18204023(2006) Although the base line technology of the Final Focus Doublet for ILC is superconducting magnet, which is supposed to be conventional, the slender structure may be suffered from its vibration. The permanent magnets, however, do not have any vibration source in it at the steady state. The five-ring-singlet configuration, proposed by R. L. Gluckstern adds 100% strength adjustability to permanent magnet quadrupole (PMQ) lens. A prototype of this lens is fabricated and under evaluation. It was originally designed for ILC that also has the extra hole for the outgoing beam. In order to realize the beam test at ATF2, the inner bore is enlarged from D20mm to D50mm to clear the background photons from Shintake-Monitor. The magnet is described. |
||
MO6RFP032 | Development of Very Small ECR H+ Ion Source with Pulse Gas Valve | 423 |
|
||
We are aiming to develop a compact accelerator based neutron source using Li(p,n) reaction. The first target is a small and high current H+ ion source as an injector of the neutron source. The demands are not only being small and high current but also longer MTBF and large ratio of H+ to molecular ions such as H2+ or H3+. Therefore, the ECR ion source with permanent magnets is selected as such an ion source. Because ECR ion sources don't have hot cathodes, longer MTBF is expected. Furthermore, they can provide high H+ ratio because of their high electron temperature. Using permanent magnets makes the ion source small and running cost low. Up to now, we have measured ion beam current on the first model of the ECR ion source, and fabricated the redesigned model. The data measured of the second model will be presented. |
||
TU5PFP073 | Recent Result of Cavity Inspection for the Superconducting Cavities at KEK-STF | 993 |
|
||
The inspections of the superconducting RF cavities seem essential in achieving high accelerating gradient. The Kyoto camera system is a good tool to survey a defect location and to be analysis a defect shape in the inner surface of the superconducting rf cavities. The cavity inspections of the AES, ACCEL, ZANON and STF Baseline cavities were inspected to study relations between a defect shape and a heating gradient of the superconducting rf cavities. The STF Baseline #5 and #6 cavities with each surface treatment (as received, after Pre-EP, after EP-1, and after vertical test with EP-2) were inspected to trace a changing spots shape. The full inspection of the EBW seam, the HAZ (heat affected zone) and hot spots region were carried out before EP-2 process and a vertical test then the shape analysis of a discovered spots was done. The vertical tests of these cavities with T-map of fixed 9-cell type were measured at STF from September 2008. The inspection and shape analysis of these cavities were made after vertical tests for based on T-map data. The result of vertical tests and changing a shape of a discovered spots with EP-2 process will be presented. |
||
FR1RAI03 | ATF2 Commissioning | 4205 |
|
||
ATF2 is a final-focus test beam line that attempts to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction is well advanced and beam commissioning of ATF2 has started in the second half of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation. |
||
|