Paper | Title | Page |
---|---|---|
MO4RAC04 | First Polarized Proton Collisions at a Beam Energy of 250 GeV in RHIC | 91 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. After having provided collisions of polarized protons at a beam energy of 100 GeV since 2001, the Relativistic Heavy Ion Collider~(RHIC) at BNL reached its design energy of polarized proton collision at 250 GeV. With the help of the two full Siberian snakes in each ring as well as careful orbit correction and working point control, polarization was preserved during acceleration from injection to 250~GeV. During the course of the Physics data taking, the spin rotators on either side of the experiments of STAR and PHENIX were set up to provide collisions with longitudinal polarization at both experiments. Various techniques to increase luminosity like further beta star squeeze and RF system upgrades as well as gymnastics to shorten the bunch length at store were also explored during the run. This paper reports the performance of the run as well as the plan for future performance improvement in RHIC. |
||
|
||
TU6RFP066 | AGS Fast Spin Resonance Jump, Magnets and Power Supplies | 1699 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC underContract No. DE-AC02-98CH10886 with the U.S. Department of Energy. In order to cross more rapidly the 82 weak resonances caused by the horizontal tune and the partial snakes, we plan to jump the horizontal tune 82 times during the acceleration cycle, 41 up and 41 down*. To achieve this, the magnets creating this tune jump will pulse on in 100 micro-seconds, hold the current flat for about four milli-seconds and zero the current in another 100 micro-seconds. The magnets are old laminated beam transport magnets with longitudinal shims closing the aperture to reduce inductance and power supply current. The power supply uses a high voltage capacitor discharge to raise the magnet current, which is then switched to a low voltage supply, and then the current is switched back to the high voltage capacitor to zero the current. The current in each of the magnet pulses must match the order of magnitude change in proton momentum during the acceleration cycle. The magnet, power supply and cabling will be described with coast saving features and operational experience. *Overcome Horizontal Depolarizing Resonances in the AGS with Tune Jump |
||
TH5RFP020 | Beam Emittance Measurements in RHIC | 3488 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The proton polarization measurements in AGS and RHIC are based on proton-carbon and proton-proton elastic scattering in the Coulomb Nuclear Interference region. Polarimeter operation in the scanning mode gives polarization profiles and beam intensity profile measurements. This polarimeter is an ideal wire-scanner due to: extremely good signal/noise ratio and high counting rate, which allows accurate bunch by bunch emittance measurements during 100 ms time of the beam crossing. The measurements of the beam emittance in both vertical and horizontal planes will be possible after polarimeter upgrade for the 2009 polarized run. Two new vacuum chambers and two target motion mechanisms and detectors assembly will be installed in each ring. One polarimeter can be used for the vertical polarization and intensity profile measurements and the second can be used for the horizontal profile measurements. The absolute accuracy limitations and cross-calibration of different techniques will be also discussed. |
||
TH6PFP014 | The Booster to AGS Transfer Line: Comparison between Model and Measurements | 3726 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The Booster to AGS (BtA) transfer line was designed to match both ions and protons into the AGS lattice. For proton beam operation the only constraint on the optics is to define a match to the AGS lattice. For ions operation there are constraints introduced by a stripping foil in the upstream part of the transfer line. For polarized proton operation there is the complication that the lattice to match into in the AGS is distorted by the presence of two partial snake magnets. In the 2008 polarized proton run it was observed that there was an optical injection mismatch. Beam experiments were conducted that showed disagreement with the model. In addition, these studies revealed some minor problems with the instrumentation in the line. A new model and more reliable measurements of the transfer line magnet currents have been implemented. Another series of experiments were conducted to test these modifications and to collect a more complete set of data to allow better understanding of the beam dynamics during the transfer and better understanding of the instrumentation. In this paper we will present the results of these experiments and comparison to the new model of the BtA. |
||
TH6PFP017 | Simulations on the AGS Horizontal Tune Jump Mechanism | 3735 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. A new horizontal tune jump mechanism has been proposed to overcome the horizontal intrinsic resonances and preserve the polarization of the proton beam in the AGS during the energy ramp. An adiabatic change of the AGS lattice is needed to avoid the emittance growth in both horizontal and vertical motion, as the emittance growth can deteriorate the polarization of the proton beam. Two critical questions are necessary to be answered: how fast can the lattice be changed and how much emittance growth can be tolerated from both optics and polarization points of view? Preliminary simulations, using a realistic AGS lattice and acceleration rate, have been carried out to give a first glance of this mechanism. Several different conditions are presented in this paper. |
||
FR1GRC04 | AGS Polarized Proton Operation in Run 2009 | 4251 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. After installation of two partial snakes in the Brookhaven Alternating Gradient Synchrotron (AGS), a polarized proton beam with 1.5*1011 intensity and 65% polarization has been achieved. There are residual polarization losses due to horizontal resonances over the whole energy ramp and some polarization loss due to vertical intrinsic resonances. Many efforts have been put in to reduce the emittances coming into the AGS and to consequently reduce polarization loss. This paper presents the accelerator setup and preliminary results from run-9 operations. |
||
|