TU3GRC05 Commissioning and Performance of LCLS Cavity BPMs 754
 
  • S.R. Smith, S. Hoobler, R.G. Johnson, T. Straumann, A. Young
    SLAC, Menlo Park, California
  • R.M. Lill, L.H. Morrison, W.E. Norum, N. Sereno, G.J. Waldschmidt, D.R. Walters
    ANL, Argonne
 
 

Funding: Work supported by U.S. Department of Energy under Contract Nos. DE-AC02-06CH11357 and DE-AC02-76SF00515.


We present the performance of the cavity beam position monitor (BPM) system for the LCLS undulator. The construction and installation phase of 34 BPMs for the undulator and 2 for the transport line have been completed. The X-band cavity BPM employs a TM010 monopole reference cavity and a TM110 dipole cavity designed to operate at a center frequency of 11.384 GHz. The signal processing electronics features a low-noise single-stage three-channel heterodyne receiver that has selectable gain and a phase locking local oscillator. The approximately 40 MHz IF is digitized by a 120M sample/second four-channel 16-bit digitizer. System requirements include sub-micron position resolution for a single-bunch beam charge of 200 pC. We discuss the system specifications and commissioning results.

 

slides icon

Slides