A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Hiroki, S.

Paper Title Page
TU6PFP090 High-Intensity Demonstrations in the J-PARC 3-GeV RCS 1504
 
  • H. Hotchi, N. Hayashi, Y. Hikichi, S. Hiroki, J. Kamiya, K. Kanazawa, M. Kawase, M. Kinsho, M. Nomura, N. Ogiwara, R. Saeki, P.K. Saha, A. Schnase, T. Shimada, Y. Shobuda, K. Suganuma, H. Suzuki, H. Takahashi, T. Takayanagi, O. Takeda, F. Tamura, N. Tani, T. Togashi, T. Ueno, M. Watanabe, Y. Watanabe, K. Yamamoto, M. Yamamoto, Y. Yamazaki, H. Yoshikawa, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • A. Ando
    LASTI, Hyogo
  • H. Harada
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • K. Hasegawa, Y. Irie, C. Ohmori, M. Yoshii
    KEK, Ibaraki
  • K. Satou, Y. Yamazaki
    J-PARC, KEK & JAEA, Ibaraki-ken
 
 

The beam commissioning of the J-PARC 3-GeV RCS started in October 2007. The initial machine parameter tuning and underlying beam studies were completed in February 2008 through various beam dynamics measurements, such as optical functions, turn-by-turn beam positions, and transverse and logitudinal beam profiles. Now the RCS is in transition from the first commissioning phase to the next challenging stage and our efforts hereafter will be focused on higher beam power operations. In this paper, we describe experimental results obtained in the high intensity demonstrations in October 2008, together with the corresponding simulation results.