A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Hillert, W.

Paper Title Page
WE6PFP063 Concept for a Polarized Electron-Nucleon Collider Utilizing the HESR Storage Ring at GSI/FAIR 2646
 
  • A. Lehrach
    FZJ, Jülich
  • K. Aulenbacher, A. Jankowiak
    IKP, Mainz
  • W. Hillert
    ELSA, Bonn
  • C. Montag
    BNL, Upton, Long Island, New York
  • T. Weis
    DELTA, Dortmund
 
 

The feasibility of a polarized Electron-Nucleon Collider (ENC) with a center-of-mass energy up to 13.5 GeV for luminosities above 2·1032 cm-2 s-1 is presently under consideration. The proposed concept integrates the planned 14 GeV High-Energy Storage Ring (HESR) for protons/deuterons and an additional 3 GeV electron ring. Calculations of cooled beam equilibria including intra-beam scattering and beam-beam interaction have been performed utilizing the BetaCool code. A special design of the interaction region is required to realize back-to-back operation of the HESR storage ring together with the elaborated collider mode. For polarized proton/deuteron beams additional equipment has to be implemented in several machines of the acceleration chain and the HESR to preserve the beam’s polarization. A scheme for polarized electrons is still under investigation. In this presentation the required modifications and extensions of the HESR accelerator facility at the future International Facility for Antiproton and Ion Research (FAIR) are discussed and the proposed concept is presented.

 
TH6PFP010 Precision Closed Orbit Correction in a Fast Ramping Stretcher Ring 3714
 
  • A. Balling, A. Dieckmann, F. Frommberger, W. Hillert
    ELSA, Bonn
 
 

Acceleration of polarized electrons in a fast ramping circular accelerator poses challenging demands on the control and stabilization/correction of the closed orbit and the vertical betatron tune, in particular on the fast energy ramp. In order to successfully compensate depolarizing resonances at a ramping speed of up to 7.5 GeV/sec (dB/dt = 2 T/sec), at ELSA the closed orbit is stabilized with high precision using a system of Beam Position Monitors and steerer magnets distributed along the ring. During acceleration, the beam positions are read out from the BPMs at a rate of 1 kHz and energy-dependent orbit corrections are applied accordingly by means of offline feed-forward techniques. The system is thus sensitive to dynamic effects and an orbit stabilization of 100 microns rms is achieved routinely. At the same time, the betatron tunes are stabilized to 0.01 by time-resolved tune measurement and appropriate manipulations of the machine optics. This presentation will cover the concepts and implementation of techniques for orbit stabilization required for the acceleration of a polarized electron beam in the fast ramping stretcher ring ELSA.