TU6RFP052 Transatlantic Transport of Fermilab 3.9 GHz Cryomodule to DESY 1665
 
  • M.W. McGee, J. Grimm, D.R. Olis, W. Schappert
    Fermilab, Batavia
 
 

Funding: Operated by Fermi Research Alliance, LLC, under Contract No. DE-AC02- 07CH11359 with the U.S. Department of Energy.


In an exchange of technology agreement, Fermilab has built and delivered a 3.9 GHz (3rd harmonic) cryomodule to Deutsches Elektron-Synchrotron (DESY) Laboratory to be installed in the TTF/FLASH beamline. Transport to Hamburg, Germany was completed via a combination of flatbed air ride truck and commercial aircraft, while minimizing transition or handling points. Initially, destructive testing of fragile components, transport and corresponding alignment stability studies were performed in order to assess the risk associated with transatlantic travel of a fully assembled cryomodule. Data logged tri-axial acceleration results of the transport with a comparison to the transport study predicted values are presented.

 
WE6RFP005 Plan of the S1-Global Cryomodules for ILC 2790
 
  • N. Ohuchi, H. Hayano, N. Higashi, H. Nakai, K. Tsuchiya, A. Yamamoto
    KEK, Ibaraki
  • T.T. Arkan, H. Carter, M.S. Champion, J. Grimm, J.S. Kerby, D.V. Mitchell, T.J. Peterson, M.C. Ross
    Fermilab, Batavia
  • S. Barbanotti, C. Pagani, P. Pierini
    INFN/LASA, Segrate (MI)
  • L. Lilje
    DESY, Hamburg
 
 

In an attempt at demonstrating an average field gradient of 31.5 MV/m as per the design accelerating gradient for ILC, a program called S1-Global is in progress as an international research collaboration among KEK, INFN, FNAL, DESY and SLAC. The S1-Global cryomodule will contain eight superconducting cavities from FNAL, DESY and KEK. The cryomodule will be constructed by joining two half-size cryomodules, each 6 m in length. The module containing four cavities from FNAL and DESY will be constructed by INFN. The design of this module is based on an improved 3rd generation TTF design. KEK will modify the 6-meter STF cryomodule to contain four KEK cavities. The designs of the cryomodules are ongoing between these laboratories, and the operation of the system is scheduled at the KEK-STF from June 2010. In this paper, the S1-Global cryomodule plan and the module design will be presented. ‘S1-Global collaboration’ as a co-author.