Gould, O.

Paper Title Page
MO6RFP025 Construction of the BNL EBIS Preinjector 407
 
  • J.G. Alessi, D.S. Barton, E.N. Beebe, S. Bellavia, O. Gould, A. Kponou, R.F. Lambiase, E.T. Lessard, V. LoDestro, R. Lockey, M. Mapes, D.R. McCafferty, A. McNerney, M. Okamura, A. Pendzick, D. Phillips, A.I. Pikin, D. Raparia, J. Ritter, J. Scaduto, L. Snydstrup, M. Wilinski, A. Zaltsman
    BNL, Upton, Long Island, New York
  • T. Kanesue
    Kyushu University, Hakozaki
  • U. Ratzinger, A. Schempp, J.S. Schmidt, M. Vossberg
    IAP, Frankfurt am Main
 
 

Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.


A new heavy ion preinjector, consisting of an Electron Beam Ion Source (EBIS), an RFQ, and IH Linac, is under construction at Brookhaven National Laboratory. This preinjector will provide ions of any species at an energy of 2 MeV/u, resulting in increased capabilities for the Relativistic Heavy Ion Collider, and the NASA Space Radiation Laboratory programs. Initial operation of the EBIS and RFQ will be reported on, along with the status of the construction and installation of the remainder of the preinjector.

 
MO6RFP027 Results of LEBT/MEBT Reconfiguration at BNL 200 MeV Linac 411
 
  • D. Raparia, J.G. Alessi, B. Briscoe, J.M. Fite, O. Gould, A. Kponou, V. Lo Destro, M. Okamura, J. Ritter, A. Zelenski
    BNL, Upton, Long Island, New York
 
 

The low energy (35 keV) and medium energy (750 keV) transport lines for (un)polarized H- have been reconfigured to reduce beam losses and the beam emittance out of the 200 MeV Linac. The medium energy line in the original layout was 7 m long, and had ten quadrupoles, two beam choppers, and three bunchers. The bunchers were necessary to keep the beam bunched at the entrance of the Linac. About 35% beam loss occurred, and the emittance growth was several fold. In the new layout, the 750 keV line is only 0.7 m long, with three quads and one buncher. To preserve beam polarization in the 35 keV line, the solenoid in front of the RFQ (35 keV to 750 keV) was replaced with an Einzel lens. To reduce the spin-precession in the LEBT, which may cause the depolarization, a 47.4 degree bend was removed and focusing solenoid in front of RFQ was replaced with an Einzel lens. We will present the experimental result of the upgrade.