A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Geffroy, N.

Paper Title Page
WE6PFP023 Status of the CLIC Beam Delivery System 2537
 
  • R. Tomás, B. Dalena, J. Resta-López, G. Rumolo, D. Schulte
    CERN, Geneva
  • D. Angal-Kalinin, F. Jackson
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • B. Bolzon, L. Brunetti, N. Geffroy, A. Jeremie
    IN2P3-LAPP, Annecy-le-Vieux
  • K.P. Schuler
    DESY, Hamburg
  • A. Seryi
    SLAC, Menlo Park, California
 
 

The CLIC BDS is experiencing the careful revision from a large number of world wide experts. This was particularly enhanced by the successful CLIC'08 workshop held at CERN. Numerous new ideas, improvements and critical points are arising, establishing the path towards the Conceptual Design Report by 2010.

 
TH5RFP080 Study of the Stabilization to the Nanometer Level of Mechanical Vibrations of the CLIC Main Beam Quadrupoles 3633
 
  • K. Artoos, O. Capatina, C.G.R.L. Collette, M. Guinchard, C. Hauviller, F. Lackner, J. Pfingstner, H. Schmickler, M.V. Sylte
    CERN, Geneva
  • B. Bolzon, L. Brunetti, G. Deleglise, N. Geffroy, A. Jeremie
    IN2P3-LAPP, Annecy-le-Vieux
  • P.A. Coe, D. Urner
    OXFORDphysics, Oxford, Oxon
  • M. Fontaine
    CEA, Gif-sur-Yvette
 
 

To reach the design luminosity of CLIC, the movements of the quadrupoles should be limited to the nanometer level in order to limit the beam size and emittance growth. Below 1 Hz, the movements of the main beam quadrupoles will be corrected by a beam-based feedback. But above 1 Hz, the quadrupoles should be mechanically stabilized. A collaboration effort is ongoing between several institutes to study the feasibility of the “nano-stabilization” of the CLIC quadrupoles. The study described in this paper covers the characterization of independent measuring techniques including optical methods to detect nanometer sized displacements and analyze the vibrations. Actuators and feedback algorithms for sub-nanometer movements of magnets with a mass of more than 400 kg are being developed and tested. Input is given to the design of the quadrupole magnets, the supports and alignment system in order to limit the amplification of the vibration sources at resonant frequencies. A full scale mock-up integrating all these features is presently under design. Finally, a series of experiments in accelerator environments should demonstrate the feasibility of the nanometer stabilization.

 
TH5RFP084 Nanometer Order of Stabilization for Precision Beam Size Monitor (Shintake Monitor) 3645
 
  • T. Kume, S. Araki, Y. Honda, T. Okugi, T. Tauchi, N. Terunuma, J. Urakawa
    KEK, Ibaraki
  • B. Bolzon, N. Geffroy, A. Jeremie
    IN2P3-LAPP, Annecy-le-Vieux
  • Y. Kamiya
    ICEPP, Tokyo
  • S. Komamiya, M. Oroku, T.S. Suehara, T. Yamanaka
    University of Tokyo, Tokyo
 
 

The ATF2, accelerator test facility has been developed confirming techniques for obtaining super low emittance beam for future particle accelerators. Here, the converged beam size is designed to be 37 nm, and a precision beam size monitor using interference fringes as a reference called Shintake monitor is used for measuring it. In order to measure the beam size with resolution of better than 10%, relative position between the beam and the interference fringes should be stabilized within few nanometers. Highly rigid tables and mounts for the Shintake monitor and final focusing magnets are adopted with highly rigid floor to ensure relative position stability. Then, the Shintake monitor can be stabilized against the beam, since the beam fluctuates coherently with the final focusing magnets. On the other hand the interference fringes are stabilized against the Shintake monitor with precise phase control system. As a result, relative position between the beam and the interference fringes is stabilized based on rigidity of tables, mounts, and floor between them. We will present our conception for stabilization and results of vibration measurements for the Shintake monitor.

 
TH5RFP087 Linear Collider Final Doublet Considerations: ATF2 Vibration Measurements 3654
 
  • B. Bolzon, N. Geffroy, A. Jeremie
    IN2P3-LAPP, Annecy-le-Vieux
  • Y. Kamiya
    ICEPP, Tokyo
  • T. Kume
    KEK, Ibaraki
  • M. Oroku, T. Yamanaka
    University of Tokyo, Tokyo
 
 

Funding: Work supported by the Agence Nationale de la Recherche of the French Ministry of Research (Programme Blanc, Project ATF2-IN2P3-KEK, contract ANR-06-BLAN-0027).


Future linear collider projects like ILC and CLIC will have beam sizes of a few nm. Vibration sources like ground motion can hamper the beam collisions. Relative jitter tolerance between the final focus magnets and the Interaction point (IP) is a fraction of the beam size. The ATF2 project proposes a test facility with a projected beam of 37nm. To measure the beam size with only 2% of error, vertical relative jitter tolerance (above 0.1Hz) between the final doublet magnets (FD) and the IP (with a Shintake beam Size Monitor: BSM) is of the order of 7nm while ground motion is of about 150nm. Thanks to determined adequate instrumentations, investigations were done to design supports for FD. Since ground motion measurements showed that this one is coherent up to 4m, more than the distance between FD and BSM, we chose a stiff support for FD fixed to the ground on its entire surface. Thus, FD and BSM should move in a coherent way. Vibration measurements show that relative motion between FD and BSM is only of 4.8nm and that flowing water in FD does not add any significant jitter. The FD support has been consequently validated on site at ATF2 to be within the vibration specifications.

 
FR1RAI03 ATF2 Commissioning 4205
 
  • A. Seryi, J.W. Amann, P. Bellomo, B. Lam, D.J. McCormick, J. Nelson, J.M. Paterson, M.T.F. Pivi, T.O. Raubenheimer, C.M. Spencer, M.-H. Wang, G.R. White, W. Wittmer, M. Woodley, Y.T. Yan, F. Zhou
    SLAC, Menlo Park, California
  • D. Angal-Kalinin, J.K. Jones
    STFC/DL/ASTeC, Daresbury, Warrington, Cheshire
  • R. Apsimon, B. Constance, C. Perry, J. Resta-López, C. Swinson
    JAI, Oxford
  • S. Araki, A.S. Aryshev, H. Hayano, Y. Honda, K. Kubo, T. Kume, S. Kuroda, M. Masuzawa, T. Naito, T. Okugi, R. Sugahara, T. Tauchi, N. Terunuma, J. Urakawa, K. Yokoya
    KEK, Ibaraki
  • S. Bai, J. Gao
    IHEP Beijing, Beijing
  • P. Bambade, Y. Renier, C. Rimbault
    LAL, Orsay
  • G.A. Blair, S.T. Boogert, V. Karataev, S. Molloy
    Royal Holloway, University of London, Surrey
  • B. Bolzon, N. Geffroy, A. Jeremie
    IN2P3-LAPP, Annecy-le-Vieux
  • P. Burrows
    OXFORDphysics, Oxford, Oxon
  • G.B. Christian
    ATOMKI, Debrecen
  • J.-P. Delahaye, D. Schulte, R. Tomás, F. Zimmermann
    CERN, Geneva
  • E. Elsen
    DESY, Hamburg
  • E. Gianfelice-Wendt, M.C. Ross, M. Wendt
    Fermilab, Batavia
  • A. Heo, E.-S. Kim, H.-S. Kim
    Kyungpook National University, Daegu
  • J.Y. Huang, W.H. Hwang, S.H. Kim, Y.J. Park
    PAL, Pohang, Kyungbuk
  • Y. Iwashita, T. Sugimoto
    Kyoto ICR, Uji, Kyoto
  • Y. Kamiya
    ICEPP, Tokyo
  • S. Komamiya, M. Oroku, T.S. Suehara, T. Yamanaka
    University of Tokyo, Tokyo
  • A. Lyapin
    UCL, London
  • B. Parker
    BNL, Upton, Long Island, New York
  • T. Sanuki
    Tohoku University, Graduate School of Science, Sendai
  • A. Scarfe
    UMAN, Manchester
  • T. Takahashi
    Hiroshima University, Graduate School of Science, Higashi-Hiroshima
  • A. Wolski
    Cockcroft Institute, Warrington, Cheshire
 
 

ATF2 is a final-focus test beam line that attempts to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction is well advanced and beam commissioning of ATF2 has started in the second half of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

 

slides icon

Slides