MO3GRI01 Operating Experience with the RIKEN Radioactive Isotope Beam Factory 60
 
  • N. Fukunishi, T. Dantsuka, M. Fujimaki, A. Goto, H. Hasebe, Y. Higurashi, E. Ikezawa, T. Kageyama, O. Kamigaito, M. Kase, M. Kidera, M. Komiyama, H. Kuboki, K. Kumagai, T. Maie, M. Nagase, T. Nakagawa, J. Ohnishi, H. Okuno, N. Sakamoto, Y. Sato, K. Sekiguchi, K. Suda, H. Suzuki, M. Wakasugi, H. Watanabe, T. Watanabe, Y. Watanabe, K. Yamada, Y. Yano, S. Yokouchi
    RIKEN Nishina Center, Wako
 
 

The RIKEN RI Beam Factory (RIBF) is pushing the limits of energy for heavy ion cyclotrons. The first experiment of the RIBF has successfully finished with the discovery of new isotopes 125Pd and 126Pd* in June 2007 with a 345-MeV/nucleon uranium beam. However, the total transmission efficiency was limited to be less than 1%. In addition, a carry-over of oil was found in the refrigerator of the Superconducting Ring Cyclotron (SRC), which was the main accelerator of the RIBF. To solve these problems, we have improved beam monitors, upgraded the oil remover system of the compressor of the liquid helium cryogenic plant at SRC and made a series of acceleration tests. As a result, 0.3 pnA of a 345-MeV/nucleon uranium beam was stably delivered to RIBF users in November 2008 and a 345-MeV/nucleon 48Ca beam with the intensity of 170 pnA was obtained in December 2008. In the PAC09 presentation, we will summarize our operating experience with the SRC and developments of RIBF accelerators in addition to most up-to-date performance of the RIBF accelerator complex.


*T. Ohnishi et al., J. Phys. Soc. Jpn. 77 (2008) 083201

 

slides icon

Slides