TU6RFP022 First Results for the Beam Commissioning of the CERN Multi-Turn Extraction 1578
 
  • S.S. Gilardoni, F. Arnold Malandain, E. Benedetto, T. Bohl, S. Cettour Cave, K. Cornelis, H. Damerau, F. Follin, T. Fowler, F. Franchi, P. Freyermuth, H. Genoud, R. Giachino, M. Giovannozzi, S. Hancock, Y. Le Borgne, D. Manglunki, G. Metral, L. Pereira, J.P. Ridewood, Y. Riva, M. Schokker, L. Sermeus, R.R. Steerenberg, B. Vandorpe, J. Wenninger
    CERN, Geneva
 
 

The Multi-Turn Extraction, a new type of extraction based on beam trapping inside stable islands in the horizontal phase space, has been commissioned during the 2008 run of the CERN Proton Synchrotron. Both single- and multi-bunch beams with a total intensity up to 1.4×1013 protons have been extracted with efficiencies up to 98%. Furthermore, injection tests in the CERN Super Proton Synchrotron were performed, with the beam then accelerated and extracted to produce neutrinos for the CERN Neutrino to Gran Sasso experiments. The results of the extensive measurement campaign are presented and discussed in details.

 
TU6RFP025 Operational Considerations for the PSB H- Injection System 1587
 
  • W.J.M. Weterings, M. Aiba, J. Borburgh, C. Carli, T. Fowler, B. Goddard
    CERN, Geneva
 
 

For the LINAC4 project the PS Booster (PSB) injection system will be upgraded. The 160 MeV H- beam will be distributed to the 4 superimposed PSB synchrotron rings and horizontally injected by means of an H- charge-exchange system. Operational considerations for the injection system are presented, including expected beam losses from field stripping of H- and excited H0 and foil scattering, possible injection failure cases and expected stripping foil lifetimes. Loading assumptions for the internal beam dumps are discussed together with estimates of doses on various components.

 
TU6RFP030 Fast Injection into the PS2 1602
 
  • J.A. Uythoven, W. Bartmann, J. Borburgh, T. Fowler, B. Goddard, M. Meddahi
    CERN, Geneva
 
 

The conceptual considerations of a fast injection system for protons and ions in the proposed PS2 accelerator are presented. Initial design parameters of the injection septum and kicker systems are derived, taking into account rise and fall times, apertures and machine optics. The requirements for an injection dump used for failures are described. Possible limitations and technical issues are outlined.

 
TU6RFP075 Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker 1723
 
  • M.J. Barnes, T. Fowler, G. Ravida
    CERN, Geneva
 
 

The goal of the present CLIC Test Facility (CTF3) is to demonstrate the technical feasibility of specific key issues in the CLIC scheme. The extracted drive beam from the combiner ring (CR), of 35 A in magnitude and 140 ns duration, is sent to the new CLic EXperimental area (CLEX) facility. A Tail Clipper (TC) is required, in the CR to CLEX transfer line, to allow the duration of the extracted beam pulse to be adjusted. Fours sets of striplines are used for the tail clipper, each consisting of a pair of deflector plates driven to equal but opposite potential. The tail clipper kick must have a fast field rise-time, of not more than 5 ns, in order to minimize uncontrolled beam loss. High voltage MOSFET switches have been chosen to meet the demanding specifications for the semiconductor switches for the modulator of the tail clipper. This paper discusses the design of the modulator; measurement data obtained during testing and operation of the tail clipper is presented and analyzed.

 
TU6RFP023 Installation and Hardware Commissioning of the Multi-Turn Extraction at the CERN Proton Synchrotron 1581
 
  • S.S. Gilardoni, D. Allard, M.J. Barnes, O.E. Berrig, A. Beuret, D. Bodart, P. Bourquin, R. Brown, M. Caccioppoli, F. Caspers, J.-M. Cravero, C.G.A. Dehavay, T. Dobers, M. Dupont, G. Favre, T. Fowler, F. Franchi, M. Giovannozzi, J. Hansen, M. Karppinen, C. Lacroix, E. Mahner, V. Mertens, J. Monteiro, R. Noulibos, E. Page, R. Principe, C. Rossi, L. Sermeus, R.R. Steerenberg, G. Vandoni, G. Villiger, Th. Zickler, C. de Almeida Martins
    CERN, Geneva
 
 

The implementation of new Multi-turn extraction at the CERN Proton Synchrotron required major hardware changes for the nearly 50-year old accelerator. The installation of new PFNs and refurbished kicker magnets for the extraction, new sextupole and octupole magnets, new power converters, together with an in-depth review of the machine aperture leading to the design of new vacuum chambers was required. As a result, a heavy programme of interventions had to be scheduled during the winter shut-down 2007-8. The newly installed hardware and its commissioning is presented and discussed in details.