Paper | Title | Page |
---|---|---|
FR5REP088 | Commissioning of the 100 MeV Preinjector for the ALBA Synchrotron | 4984 |
|
||
A turn key 100 MeV linac was provided by THALES Communications in order to inject electrons into the booster synchrotron of ALBA*. The linac was commissioned in October 2008. This paper will remind the main features of the linac** and will give results obtained during the commissioning tests. The energy and emittance measurements have been done on the transfer line concieved and realized by CELLS. Specified and measured beam parameters will be compared to show the performance of the entire system. * D. Einfeld "Progress of ALBA", EPAC08, Genoa, Italy, June 2008. |
||
WE5PFP012 | RF Deflector for Bunch Length Measurement at Low Energy at PSI | 2012 |
|
||
RF deflectors are crucial diagnostic tools for bunch length and slice emittance measurements with sub-picosecond resolution. Their use is essential in commissioning and operation of VUV and X-ray FELs. The 250MeV FEL injector, under construction at PSI, will use two of them. The first one will be installed after the gun at low energy (~7MeV), the second one at the end of the Linac at high energy (250MeV). The first RF deflector consists of a single cell standing wave cavity working on the TM110 deflecting mode, and tuned at 2997.912 MHz (frequency of the linac structures). In this note we report the motivation of this measurement, beam dynamics and beam diagnostics considerations and the RF design and simulations of this cavity. |