Paper | Title | Page |
---|---|---|
WE5PFP054 | HOM Survey of the First CEBAF Upgrade Style Cavity Pair | 2123 |
|
||
Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. For the planned CEBAF upgrade ten new cryomodules are required to increase the beam energy to the envisaged 12 GeV. Extensive cavity and cryomodule R&D has been done previously, including the installation of a new cryomodule dubbed “Renascence” in CEBAFs north linac in 2007. It houses both seven-cell low loss and high gradient type of cavities thereby serving as a testbed to address and cope with crucial technological challenges. Based on this experience a final iteration on the upgrade cavity has been performed to improve various aspects of HOM-damping and thermal stability. Two such cavities have been produced and qualified. A thorough cavity HOM-survey has been performed to verify the integrity of the cavities and to guarantee the impedance requirements of each crucial HOM. This paper details the results of HOM-surveys performed for the first two upgrade style low loss cavities tested both individually in a vertical Dewar and horizontally in a dedicated cavity pair cryomodule. The safety margin to the worst beam break-up scenario at 12 GeV has been concluded. |