A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Daly, E.

Paper Title Page
WE5PFP054 HOM Survey of the First CEBAF Upgrade Style Cavity Pair 2123
 
  • F. Marhauser, E. Daly, G.K. Davis, M.A. Drury, C. Grenoble, J. Hogan, R. Manus, J.P. Preble, C.E. Reece, R.A. Rimmer, K. Tian, H. Wang
    JLAB, Newport News, Virginia
 
 

Funding: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177.


For the planned CEBAF upgrade ten new cryomodules are required to increase the beam energy to the envisaged 12 GeV. Extensive cavity and cryomodule R&D has been done previously, including the installation of a new cryomodule dubbed “Renascence” in CEBAFs north linac in 2007. It houses both seven-cell low loss and high gradient type of cavities thereby serving as a testbed to address and cope with crucial technological challenges. Based on this experience a final iteration on the upgrade cavity has been performed to improve various aspects of HOM-damping and thermal stability. Two such cavities have been produced and qualified. A thorough cavity HOM-survey has been performed to verify the integrity of the cavities and to guarantee the impedance requirements of each crucial HOM. This paper details the results of HOM-surveys performed for the first two upgrade style low loss cavities tested both individually in a vertical Dewar and horizontally in a dedicated cavity pair cryomodule. The safety margin to the worst beam break-up scenario at 12 GeV has been concluded.