Paper | Title | Page |
---|---|---|
MO6RFP063 | First Results from Commissioning of the PHIN Photo Injector for CTF3 | 509 |
|
||
Installation of the new photo-injector for the CTF3 drive beam (PHIN) has been completed on a stand-alone test bench. The photo-injector operates with a 2.5 cell RF gun at 3 GHz, using a Cs2Te photocathode illuminated by a UV laser beam. The test bench is equipped with different beam monitoring devices as well as a 90-degree spectrometer. A grid of 200 micrometer wide slits can be inserted for emittance measurements. The laser used to trigger the photo-emission process is a Nd:YLF system consisting of an oscillator and a preamplifier operating at 1.5 GHz and two powerful amplifier stages. The infrared radiation produced is frequency quadrupled in two stages to obtain the UV. A Pockels cell allows adjusting the length of the pulse train between 50 nanoseconds and 50 microseconds. The nominal train length for CTF3 is 1.272 microseconds (1908 bunches). The first electron beam in PHIN was produced in November 2008. In this paper, results concerning the operation of the laser system and measurements performed to characterize the electron beam are presented. |
||
WE6PFP079 | Conceptual Design of the Drive Beam for a PWFA-LC | 2682 |
|
||
Funding: Work supported by the DOE under contract DE-AC02-76SF00515. Plasma Wake-Field Acceleration (PWFA) has demonstrated acceleration gradients above 50 GeV/m. Simulations have shown drive/witness bunch configurations that yield small energy spreads in the accelerated witness bunch and high energy transfer efficiency from the drive bunch to the witness bunch, ranging from 30% for a Gaussian drive bunch to 95% for bunch with triangular shaped longitudinal profile. These results open the opportunity for a linear collider that could be compact, efficient and more cost effective than the present microwave technologies. A concept of a PWFA-based Linear Collider (PWFA-LC) has been developed by the PWFA collaboration. Here we will describe the conceptual design and optimization of the drive beam, which includes the drive beam linac and distribution system. We apply experience of the CLIC drive beam design and demonstration in the CLIC Test Facility (CTF3) to this study. We discuss parameter optimization of the drive beam linac structure and evaluate the drive linac efficiency in terms of the drive beam distribution scheme and the klystron / modulator requirements. |
||
TH3GBI01 | Two-Beam Linear Colliders – Special Issues | 3100 |
|
||
The path towards a multi-TeV e+e- linear collider proposed by the CLIC study is based on the Two Beam Acceleration scheme. Such a scheme is promising in term of efficiency, reliability and cost. The rationale behind the two-beam scheme is discussed in the paper, together with the special issues related to this technology and the R&D needed to demonstrate its feasibility. |
||
|
||
TH5RFP066 | Longitudinal Beam Profile Measurements at CTF3 Using Coherent Diffraction Radiation | 3600 |
|
||
The diagnostics of a 6D phase space distribution is a crucial and a challenging task, which is required for modern and future installations such as light sources or linear colliders, like CLIC. The longitudinal profile is one of the parameters which needs to be monitored. A setup for the investigation of coherent diffraction radiation from a conducting screen as a tool for non-invasive longitudinal electron beam profile diagnostics has been designed and installed in the CRM line of the CLIC Test Facility (CTF3) at CERN. This setup also allows the measurements of Coherent Synchrotron Radiation from the last bending magnet. In this report we present the status of the experiment and show some preliminary results on coherent synchrotron radiation and coherent diffraction radiation studies. The plans for interferometric measurements of coherent radiation are also presented. |
||
FR1RAC04 | Achievements in CTF3 and Commissioning Status | 4210 |
|
||
The aim of the last CLIC test facility CTF3, built at CERN by an international collaboration, is to prove the main feasibility issues of the CLIC two-beam acceleration technology. The main points which CTF3 should demonstrate by 2010 are the generation of a very high current drive beam and its use to efficiently produce and transfer RF power to high-gradient accelerating structures. To prove the first point a delay loop and a combiner ring have been built, following a linac, in order to multiply the current by a factor two and four, respectively. The power generation and transfer and the high gradient acceleration are instead demonstrated in the CLIC experimental area (CLEX), where the drive beam is decelerated in special power extraction structures(PETS). In this paper we describe the results of the combination in the ring, properly working after the cure of the vertical instability which limited high current operation, and the commissioning of the new beam lines installed in the second half of 2008, including response matrix analysis and dispersion measurements used to validate the optics model. The results of the energy transfer will be also briefly described. |
||
|