A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Convery, M.E.

Paper Title Page
MO4RAC03 Optimization of Integrated Luminosity in the Tevatron 88
 
  • C. Gattuso, M.E. Convery, M.J. Syphers
    Fermilab, Batavia
 
 

Funding: Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy.


We present the strategy which has been used recently to optimize integrated luminosity at the Fermilab Tevatron proton-antiproton collider. We use a relatively simple model where we keep the proton intensity fixed, use parameters from fits to the luminosity decay of recent stores as a function of initial antiproton intensity (stash size), and vary the stash size to optimize the integrated luminosity per week. The model assumes a fixed rate of antiproton production, that a store is terminated as soon as the target stash size for the next store is reached, and that the only downtime is due to store turn-around time. An optimal range of stash size is predicted. Since the start of Tevatron operations based on this procedure we have seen an improvement of approximately 35% in integrated luminosity. Other recent operational improvements have been achieved by decreasing the shot setup time and by reducing beam-beam effects by making the proton and antiproton brightnesses more compatible , for example by scraping protons to smaller emittances.

 

slides icon

Slides