Paper | Title | Page |
---|---|---|
TH5RFP054 | Construction and Characterization of the Inductive Pick-Up Series for Beam Position Monitoring in the TBL Line of the CTF3 at CERN | 3576 |
|
||
Funding: FPA 2007-31124-E (MICINN) A set of two Inductive Pick-Up (IPU) prototypes with its associated electronics for Beam Position Monitoring in Test Beam Line (TBL) in the 3rd CLIC Test Facility (CTF3) at CERN were designed, constructed, characterized and tested by the IFIC. One of these two prototypes is already mounted in the first module of the TBL line for testing with beam. In the first part of this paper we described the first tests performed with beam in the prototype. The second part of this paper is dedicated to the description of the construction, performance characterization and installation of a series of 15 units, including its respective mechanical supports in the complete TBL line in spring 2009. |