A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Carniel, A.

Paper Title Page
WE5RFP020 Operational Advances at Elettra and its New Full Energy Injector 2309
 
  • E. Karantzoulis, A. Carniel, S. Ferry, S. Krecic
    ELETTRA, Basovizza
 
 

A full energy injector consisting of a 100 MeV linac and an up to 2.5 GeV booster is in operation since March 2008 replacing the previous 1 GeV linac injector to be used after refurbishing and upgrade for the new fourth generation light source (FEL) currently under construction at Sincrotrone Trieste. The measurements on the new injector, problems and solutions employed to increase its efficiency, reproducibility and reliability, aiming towards top-up operations in the near future, and its impact on the Elettra storage ring are presented and discussed.

 
TH6REP098 Preinjector Gun Upgrade, Timing and Synchronization and Preparation for the Top-Up Injection in Elettra 4183
 
  • A. Carniel, S. Bassanese, M. Ferianis, E. Karantzoulis, C. Scafuri, A. Vascotto
    ELETTRA, Basovizza
 
 

Elettra is the third generation light source in operation in Trieste since 1993,upgraded with a full energy booster injector last year. Top-up operation is on schedule in the near future but already the new timing system and gun are ready to operate in this mode. The paper describes all tasks and requirements needed to satisfy top-up injection include custom made hardware, interaction with controls and radiation protection system.