MO4GRI01 | High Power Fast Ramping Power Supplies | 112 |
|
||
Hundred megawatt level fast ramping power converters to drive proton and heavy ion machines are under research and development at accelerator facilities in the world. This is a leading edge technology. There are several topologies to achieve this power level. Their advantages and related issues will be discussed. |
||
|
||
TU6RFP003 | Commissioning of the New AGS MMPS Transformers | 1538 |
|
||
The Brookhaven AGS Main Magnet Power Supply is a thyristor control supply rated at 5.5KAmps, ±9KV. The peak magnet power is 50MW,which is fed from a motor/generator manufactured by Siemens. During rectify and invert operation, the P Bank power supplies are used. During the flattops the F Bank power supplies are used. The P Bank power supplies are fed from two 23MVA transformers and the F Bank power supplies are fed from two 5.3 MVA transformers. The fundamental frequency of the F Bank power supplies is 1440Hz while the P banks were 720Hz. It was very important to reduce the ripple during rectify to improve polarized proton operations. For this reason and also because the original transformers were 45 years old we replaced these transformers with new ones and we made the fundamental frequency of both P and F banks 1440 Hz. This paper will highlight the major hurdles that were involved during the installation of the new transformers. It will present waveforms while running at different power levels up to 6MW full load and show the transition from the F-Bank power supplies to the P-Banks and also show the improvements in ripple made on the P-Bank power supplies. |
||
TH6PFP014 | The Booster to AGS Transfer Line: Comparison between Model and Measurements | 3726 |
|
||
Funding: Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy. The Booster to AGS (BtA) transfer line was designed to match both ions and protons into the AGS lattice. For proton beam operation the only constraint on the optics is to define a match to the AGS lattice. For ions operation there are constraints introduced by a stripping foil in the upstream part of the transfer line. For polarized proton operation there is the complication that the lattice to match into in the AGS is distorted by the presence of two partial snake magnets. In the 2008 polarized proton run it was observed that there was an optical injection mismatch. Beam experiments were conducted that showed disagreement with the model. In addition, these studies revealed some minor problems with the instrumentation in the line. A new model and more reliable measurements of the transfer line magnet currents have been implemented. Another series of experiments were conducted to test these modifications and to collect a more complete set of data to allow better understanding of the beam dynamics during the transfer and better understanding of the instrumentation. In this paper we will present the results of these experiments and comparison to the new model of the BtA. |