TU6RFP023 | Installation and Hardware Commissioning of the Multi-Turn Extraction at the CERN Proton Synchrotron | 1581 |
|
||
The implementation of new Multi-turn extraction at the CERN Proton Synchrotron required major hardware changes for the nearly 50-year old accelerator. The installation of new PFNs and refurbished kicker magnets for the extraction, new sextupole and octupole magnets, new power converters, together with an in-depth review of the machine aperture leading to the design of new vacuum chambers was required. As a result, a heavy programme of interventions had to be scheduled during the winter shut-down 2007-8. The newly installed hardware and its commissioning is presented and discussed in details. |
||
TU6RFP075 | Design, Testing and Operation of the Modulator for the CTF3 Tail Clipper Kicker | 1723 |
|
||
The goal of the present CLIC Test Facility (CTF3) is to demonstrate the technical feasibility of specific key issues in the CLIC scheme. The extracted drive beam from the combiner ring (CR), of 35 A in magnitude and 140 ns duration, is sent to the new CLic EXperimental area (CLEX) facility. A Tail Clipper (TC) is required, in the CR to CLEX transfer line, to allow the duration of the extracted beam pulse to be adjusted. Fours sets of striplines are used for the tail clipper, each consisting of a pair of deflector plates driven to equal but opposite potential. The tail clipper kick must have a fast field rise-time, of not more than 5 ns, in order to minimize uncontrolled beam loss. High voltage MOSFET switches have been chosen to meet the demanding specifications for the semiconductor switches for the modulator of the tail clipper. This paper discusses the design of the modulator; measurement data obtained during testing and operation of the tail clipper is presented and analyzed. |
||
TU6RFP076 | Measurement of Longitudinal and Transverse Impedance of Kicker Magnets Using the Coaxial Wire Method | 1726 |
|
||
Fast kicker magnets are used to inject beam into and eject beam out of the CERN SPS accelerator ring. These kickers are generally ferrite loaded transmission line type magnets with a rectangular shaped aperture through which the beam passes. Unless special precautions are taken the impedance of the ferrite yoke can provoke significant beam induced heating, even above the Curie temperature of ferrite. In addition the impedance can contribute to beam instabilities. In this paper different variants of the coaxial wire method, both for measuring longitudinal and transverse impedance, are briefly discussed in a tutorial manner and do's and don'ts are shown on practical examples. In addition we present the results of several impedance measurements for SPS kickers using the wire method and compare those results with theoretical models. |
||
FR2RAC02 | Measurement and Analysis of SPS Kicker Magnet Heating and Outgassing with Different Bunch Spacing | 4264 |
|
||
Fast kicker magnets are used to inject beam into and eject beam out of the CERN SPS accelerator ring. These kickers are generally ferrite loaded transmission line type magnets with a rectangular shaped aperture through which the beam passes. Unless special precautions are taken the impedance of the ferrite yoke can provoke significant beam induced heating, over several hours, even above the Curie temperature of the ferrite. At present the nominal bunch spacing in the SPS is 25 ns, however for an early stage of LHC operation it is preferable to have 50 ns bunch spacing. Machine Development (MD) studies have been carried out with an inter-bunch spacing of 25 ns, 50 ns or 75 ns. For some of the SPS kicker magnets the 75 ns bunch spacing resulted in considerable beam induced heating. In addition the MDs showed that 50 ns bunch spacing could result in a very rapid pressure rise in the kicker magnet and thus cause an interlock. This paper discusses the MD observations of the SPS kickers and analyses the available data to provide explanations for the phenomena: possible remedies are also discussed. |
||
|